BiharCapital project
₹1,339crore
₹1,339 crore · approved 28 August 2024, including land cost
1,670 acres · Dobhi, Gaya · AKIC industrial cluster
Industry, model and participation details
Manufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentReal Estate, Housing & LandAgriculture, Food Processing & Rural EconomyThe 1,670-acre IMC Gaya combines an approved ₹1,339-crore infrastructure project with a new investor-facilitation milestone. The October MoUs concern prospective manufacturing investment; they are separate from the cluster budget and from trunk-infrastructure contracts already appointed.
Trunk infrastructure under execution · new investor MoUs and allotment portal
Bihar Integrated Manufacturing City Gaya Limited — BIADA / NICDIT joint venture
Project & commercial implications →Maharashtra · Gujarat · Dadra & Nagar HaveliDevelopment pipeline
508 km · twelve planned stations · Mumbai–Ahmedabad corridor
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentDigital, Telecom & Electronics2026_NHSRC_295569_1 · Operations consultancy · qualification under the actual tender: Submission not started · recorded closing 7/12/2026, 3:00:00 pm IST · checked 26 October 2026
2026_NHSRC_295369_1 · Operational readiness and transition · EOI / qualification selection: Submission not started · recorded closing 18/1/2027, 3:00:00 pm IST · checked 26 October 2026
The 508-km corridor now has separately identified operations-consultancy and readiness-and-transition selection records. Their differing scopes, qualification routes and future submission windows matter to rail operators, specialist advisers and delivery partners preparing for a complex operational handover.
OdishaCapital project
₹35,000crore
₹35,000 crore · potential investment stated in the 22 October MoU announcement
4 × 800 MW · proposed ultra-supercritical coal-based plant
Industry, model and participation details
Power, Energy & RenewablesMining, Metals & Critical MineralsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentNLC India Limited · Project proponentIndustrial Promotion and Investment Corporation of Odisha Limited · State investment-promotion counterpartNLC India’s IPICOL agreements identify a proposed 3,200-MW thermal plant, a beach-sand processing facility and gasification-linked fertiliser exploration. Each has a different development basis; the announced investment intentions do not constitute one sanctioned project or an open EPC procurement.
OdishaCapital project
₹2,000crore
₹2,000 crore · tentative investment stated in the 22 October MoU announcement
Mineral-processing facility · site and throughput not specified
Industry, model and participation details
Power, Energy & RenewablesMining, Metals & Critical MineralsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentNLC India Limited · Project proponentIndustrial Promotion and Investment Corporation of Odisha Limited · State investment-promotion counterpartNLC India’s IPICOL agreements identify a proposed 3,200-MW thermal plant, a beach-sand processing facility and gasification-linked fertiliser exploration. Each has a different development basis; the announced investment intentions do not constitute one sanctioned project or an open EPC procurement.
OdishaDevelopment pipeline
Technical-feasibility exploration · synthesis-gas applications
Industry, model and participation details
Power, Energy & RenewablesMining, Metals & Critical MineralsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentNLC India Limited · Project proponentIndustrial Promotion and Investment Corporation of Odisha Limited · State investment-promotion counterpartNLC India’s IPICOL agreements identify a proposed 3,200-MW thermal plant, a beach-sand processing facility and gasification-linked fertiliser exploration. Each has a different development basis; the announced investment intentions do not constitute one sanctioned project or an open EPC procurement.
BiharDevelopment pipeline
Mobile Quality Control Van · supply, operation and maintenance
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentDigital, Telecom & ElectronicsMoRTH’s separate second-call procurements cover supply, operation and maintenance of Mobile Quality Control Vans for non-destructive testing of National Highway works. The opportunities concern a defined testing service and equipment lifecycle, not the construction value of every road tested.
GoaDevelopment pipeline
Existing bridge · sensors, data acquisition and reporting
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentDigital, Telecom & Electronics2026_MoRTH_929604_1 · Borim bridge monitoring · qualified technical participation: Submission not started · recorded closing 23/11/2026, 11:00:00 am IST · checked 26 October 2026
Two Goa contracts address sensors, data acquisition, transmission and reporting for existing bridges. Their value lies in a dependable structural-monitoring service and an actionable engineering record—not new bridge construction or an assumption that sensor installation alone certifies structural safety.
GoaDevelopment pipeline
Existing bridge · sensors, data acquisition and reporting
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentDigital, Telecom & Electronics2026_MoRTH_929628_1 · Old Zuari bridge monitoring · qualified technical participation: Submission not started · recorded closing 23/11/2026, 11:00:00 am IST · checked 26 October 2026
Two Goa contracts address sensors, data acquisition, transmission and reporting for existing bridges. Their value lies in a dependable structural-monitoring service and an actionable engineering record—not new bridge construction or an assumption that sensor installation alone certifies structural safety.
AssamDevelopment pipeline
Kamakhya Railway Station–Kamakhya Temple connection · DBFOT
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentDBFOTThe proposed connection between Kamakhya Railway Station and Kamakhya Temple is being procured on DBFOT terms. Investor assessment should connect the transport function, land and access interfaces, technology partnership and lifecycle obligations rather than treat the notice as a stand-alone engineering appointment.
MaharashtraCapital project
₹922.67crore
₹922.67 crore · official estimated project cost
37.3-hectare protected water area · 424 Phase-I berths · 604 at full build-out
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentFinancial Services, Capital Markets & InsuranceDBFOTPPPMumbai Port Authority’s ₹922.67-crore project combines a protected marina with hospitality, yacht services and waterfront activity. The concessionaire’s investment case must distinguish the marine works already commenced by the Port from landside development, later berth expansion and long-term operations.
JharkhandDevelopment pipeline
NH-133 · Mirza Chauki–Mahagama corridor
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentNHAI’s new preparation record concerns the NH-133 section between Mirza Chauki, identified in the notice as earlier Ekchari, and Mahagama. The commercial pipeline begins with defining the corridor and preconstruction requirements; the design appointment is not a main-works award.
RajasthanDevelopment pipeline
NH-921 km 0.850–50.246 · 49.396 km four-laning; NH-21 km 0.000–1.700 flyover
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentEPCThe procurement combines 49.396 km of four-laning with paved shoulders on NH-921 and a separate 1.700-km flyover scope on NH-21. Contractors and finance partners should evaluate the combined package’s road, structural and junction interfaces rather than a professional-services opportunity.
RajasthanDevelopment pipeline
Six-lane access-controlled Rasisar–Deogarh · NH-754K / new NH-754A
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentThe six-lane access-controlled section is entering a fresh supervision procurement during operation and maintenance. The relevant industry proposition is asset performance, inspection evidence and contractual management—not a newly available award to build the entire Amritsar–Jamnagar corridor.
Uttar PradeshDevelopment pipeline
Mobile Quality Control Van · supply, operation and maintenance
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentDigital, Telecom & ElectronicsMoRTH’s separate second-call procurements cover supply, operation and maintenance of Mobile Quality Control Vans for non-destructive testing of National Highway works. The opportunities concern a defined testing service and equipment lifecycle, not the construction value of every road tested.
GujaratDevelopment pipeline
Integrated Financial Management System · G-ACRP
Industry, model and participation details
Infrastructure & Urban DevelopmentFinancial Services, Capital Markets & InsuranceDigital, Telecom & ElectronicsGovernance & Admin2026_WBAMC_924353_1 · Supporting professional services: Recorded Deadline Passed · recorded closing 23/10/2026, 3:00:00 pm IST · checked 20 October 2026
Ahmedabad’s World Bank-financed city-resilience programme includes an Integrated Financial Management System. The consultant-selection extension creates a defined delivery and public-finance opportunity, separate from the wider city’s capital programme.
India · DelhiDevelopment pipeline
Digital transformation · patents, designs and trademarks administration
Industry, model and participation details
Digital, Telecom & ElectronicsAI, Cybersecurity & Data GovernanceGovernance & AdminTelecommunications Consultants India Limited · System-integrator selection authorityOffice of the Controller General of Patents, Designs and Trade Marks · Named institution for the digital-transformation requirement2026_TCIL_295134_1 · TCIL system-integrator selection EOI: Dated participation record · recorded closing 2/11/2026, 3:00:00 pm IST · checked 20 October 2026
TCIL's system-integrator selection concerns the digital transformation of India's patents, designs and trademarks administration. The opportunity calls for an executable technology and service-delivery proposition, supported by clear implementation, data and contractual responsibilities.
TCIL system-integrator EOI · submission recorded for 2 November
TCIL as system-integrator selection authority; CGPDTM as named client institution
Project & commercial implications →KeralaDevelopment pipeline
Deep-sea fishery training fleet · modernisation preparation
Industry, model and participation details
Transport, Logistics & MobilityEducation & SkillsAgriculture, Food Processing & Rural Economy2026_DAHDF_854330_2 · Single-tender consultancy · participation restricted to the actual invitation: Recorded Deadline Passed · recorded closing 29/10/2026, 4:00:00 pm IST · checked 20 October 2026
Modernisation of the deep-sea fishery training fleet requires a defined operating and investment case before implementation. The current DPR notice is officially classified as a single tender; public visibility is not an unrestricted invitation to consulting firms.
UttarakhandDevelopment pipeline
86 km · two lanes with paved shoulders · Gangotri–Heena
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityEnvironment & Climate2026_MoRTH_922363_1 · Supporting professional services · qualification under the actual RFP: Dated participation record · recorded closing 2/11/2026, 5:00:00 pm IST · checked 20 October 2026
Rehabilitation and widening of the NH-34 corridor from Gangotri to Heena remain the underlying project. A fresh DPR submission extension advances the preparation record without establishing a construction award, approved capital budget or completed design.
LadakhDevelopment pipeline
9-MW hydro project · 66-kV double-circuit line
Industry, model and participation details
Power, Energy & RenewablesInfrastructure & Urban DevelopmentInaugurated generation and evacuation infrastructure. Track the responsible operators and formally commissioned work without treating the inauguration as a new capital or O&M tender.
India · MaharashtraDevelopment pipeline
Autonomous aerial logistics development · RDI-backed technology programme
Industry, model and participation details
Defence, Aerospace & Homeland SecurityManufacturing, MSME & Industrial PolicyFinancial Services, Capital Markets & InsuranceTDB’s announcement illustrates debt-backed private technology development, with financing and total development cost kept distinct. The commercial lens is milestone governance and authorised participation—not an operational capability claim or an open production order.
Development-financing agreement announced · targets are not achieved performance
ideaForge Technology Limited; financing through Technology Development Board
Project & commercial implications →West BengalDevelopment pipeline
150-capacity women’s hostel · main gate · assembly-hall improvements
Industry, model and participation details
Infrastructure & Urban DevelopmentEducation & SkillsTransport, Logistics & Mobility2026_BandR_930155_1 · Supporting professional services: Dated participation record · recorded closing 4/11/2026, 5:30:00 pm IST · checked 20 October 2026
A 150-capacity women’s hostel, a new main gate and assembly-hall improvements form a defined maritime-education campus programme. Architecture and design procurement is the preparation milestone, with execution-stage support included.
RajasthanDevelopment pipeline
Hardware, networking, audiovisual equipment and software · listed location Rajasthan
Industry, model and participation details
Digital, Telecom & ElectronicsAI, Cybersecurity & Data GovernanceEducation & SkillsEquipment Supply2026_TCIL_294962_1 · IT-infrastructure goods procurement: Recorded Deadline Passed · recorded closing 22/10/2026, 5:00:00 pm IST · checked 20 October 2026
TCIL's procurement combines hardware, networking, audiovisual equipment and software for establishing India AI Labs. The opportunity is on the technology-supply and integration side, with specification compliance and lifecycle support central to the commercial offer.
India · Saudi ArabiaDevelopment pipeline
Proposed bilateral electrical interconnection · scope under discussion
Industry, model and participation details
Power, Energy & RenewablesInfrastructure & Urban DevelopmentForeign PolicyDigital, Telecom & ElectronicsMinistry of Power · Indian institution participating in the bilateral dialogueMinistry of Energy, Kingdom of Saudi Arabia · Saudi institution participating in the bilateral dialogueThe bilateral power-sector meeting identifies a proposed interconnection and a wider cooperation agenda spanning EHV transmission, renewable-grid integration, data-centre demand and grid codes. The commercial opportunity is disciplined project and institutional preparation, pending defined implementation decisions.
Proposed interconnection · bilateral discussions reported 19 October
Ministry of Power, India / Ministry of Energy, Saudi Arabia, for bilateral dialogue
Project & commercial implications →RajasthanDevelopment pipeline
Proposed Kota–Rawatbhata spur · Rajasthan
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & Mobility2026_MoRTH_930727_1 · Supporting professional services · qualification under the actual RFP: Dated participation record · recorded closing 30/11/2026, 11:00:00 am IST · checked 20 October 2026
MoRTH's preparation programme for the proposed Rajasthan spur creates a road-planning and engineering opportunity. The commercial task is to connect the commissioned studies to route, demand, approvals and delivery decisions before assuming a construction package or capital value.
LadakhDevelopment pipeline
23,800 sq m · 35-lakh annual passenger design capacity
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityA completed terminal with a design capacity of 35 lakh passengers annually. Assess actual airport operating arrangements and demand; no concession or currently open services package is implied.
India · DelhiDevelopment pipeline
AI services for claims and disbursement analytics · limited RFQ
Industry, model and participation details
AI, Cybersecurity & Data GovernanceDigital, Telecom & ElectronicsFinancial Services, Capital Markets & InsuranceGovernance & Admin2026_DIT_930015_1 · Limited NeGD AI-services invitation; eligibility governed by RFQ3: Dated participation record · recorded closing 5/11/2026, 3:00:00 pm IST · checked 20 October 2026
Fraud analysis and anomaly detection in government claims and disbursements require a governed implementation proposition. The NeGD invitation is limited, and participation must follow its RFQ rather than a general open-market assumption.
KarnatakaDevelopment pipeline
136.7 km · km 264.00–400.70 · proposed four lanes with paved shoulders
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & Mobility2026_MoRTH_930446_1 · Supporting professional services · qualification under the actual RFP: Submission not started · recorded closing 27/11/2026, 3:00:00 pm IST · checked 20 October 2026
The proposed upgrade from two to four lanes with paved shoulders creates a substantial highway-preparation assignment. Its consultancy estimate and submission calendar are distinct from the road's eventual investment approval and construction procurement.
Ladakh · Himachal PradeshCapital project
₹2,500crore
₹2,500 crore · reported cost of the inaugurated road
298 km · completed road connectivity
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityBorder Roads Organisation · Road implementing organisationThe completed BRO corridor provides a defined connectivity asset. Its reported cost is distinct from a new works procurement; operating-service opportunities require their own purchaser and contract.
Uttar PradeshDevelopment pipeline
Sector 164, Noida · design, build, finance, operate and transfer
Industry, model and participation details
Digital, Telecom & ElectronicsAI, Cybersecurity & Data GovernanceInfrastructure & Urban DevelopmentPower, Energy & RenewablesFinancial Services, Capital Markets & InsuranceDBFOTPPPInvestment/JVO&M/ServicesEPC/Construction2026_TCIL_290900_1 · PPP-DBFOT developer and operator selection: Recorded Deadline Passed · recorded closing 29/10/2026, 3:00:00 pm IST · checked 20 October 2026
TCIL's data-centre procurement combines construction, financing, operations and eventual transfer under a PPP-DBFOT model. The investment case depends on project rights, enabling infrastructure, demand and lifecycle obligations rather than the bid-security amount or the approach of a submission date.
Assam · IndiaDevelopment pipeline
Proposed geological and geophysical analytics solution · GenAI
Industry, model and participation details
Power, Energy & RenewablesAI, Cybersecurity & Data GovernanceDigital, Telecom & ElectronicsTelecommunications Consultants India Limited · Pre-tender consortium-partner selection authorityOil India Limited · Named prospective client for the analytics solution2026_TCIL_294384_1 · Pre-tender consortium-partner EOI, not OIL award: Recorded Deadline Passed · recorded closing 20/10/2026, 6:00:00 pm IST · checked 20 October 2026
TCIL's consortium-partner EOI concerns a proposed generative-AI solution for geological and geophysical analytics for Oil India. The immediate commercial issue is a qualified teaming arrangement, not an awarded upstream contract or an established implementation budget.
Pre-tender consortium EOI · recorded closing 20 October, 18:00 IST
TCIL for pre-tender consortium selection; Oil India as named prospective client
Project & commercial implications →OdishaDevelopment pipeline
Concrete road overlay and side drains · defined internal-port stretch
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban Development2026_MoS_930027_1 · Supporting professional services: Dated participation record · recorded closing 2/11/2026, 5:30:00 pm IST · checked 20 October 2026
Concrete overlay and side-drain improvements on a defined internal port-road stretch form the underlying infrastructure programme. The current notice concerns supporting project-management consultancy, not a newly established main-works capital value.
IndiaCapital project
₹454crore
₹454 crore · published turnkey works tender estimate
Existing 2×80 MW · Pench HPS, Totladoh · renovation and uprating
Industry, model and participation details
Power, Energy & RenewablesInfrastructure & Urban DevelopmentManufacturing, MSME & Industrial PolicyEPC/ConstructionEquipment Supply2026_MPPGC_542788_1 · Turnkey works · qualification under the actual tender: Dated participation record · recorded closing 24/12/2026, 5:00:00 pm IST · checked 20 October 2026
MPPGCL’s renovation, modernisation and uprating procurement concerns an existing hydropower asset at Totladoh. The defined works estimate and delivery scope create an EPC/OEM screening opportunity, while the existing capacity must remain distinct from any eventual uprated output.
Karnataka · IndiaDevelopment pipeline
India’s Quantum Secure and Sensing Networks · technology-development programme
Industry, model and participation details
AI, Cybersecurity & Data GovernanceDigital, Telecom & ElectronicsManufacturing, MSME & Industrial PolicyFinancial Services, Capital Markets & InsuranceThe RDI agreement connects ₹150 crore of support to a ₹300-crore development programme for quantum-secure and sensing networks. The financing structure, development milestones and commercial rights require separate assessment; this is neither an open grant nor demonstrated deployment.
RDI agreement announced · development and commercial acceptance remain separate
QNu Labs Private Limited; Technology Development Board financing
Project & commercial implications →Andhra PradeshDevelopment pipeline
216 parcels · rescheduled second phase of the existing portfolio
Industry, model and participation details
Real Estate, Housing & LandMining, Metals & Critical MineralsFinancial Services, Capital Markets & InsuranceInfrastructure & Urban DevelopmentRashtriya Ispat Nigam Limited · Asset ownerNational Land Monetization Corporation · Monetisation facilitatorQuikr India Pvt. Ltd. · Appointed transaction consultantRINL-2026-phase1-registration · Phase-one investor registration and EMD: Recorded Deadline Passed · recorded closing 8/10/2026, 5:00:00 pm IST · checked 11 October 2026
RINL-2026-phase2-auction · Investor e-auction · NLMC’s revised timetable; registration date specified separately: Recorded Deadline Passed · recorded closing 30/10/2026, 5:00:00 pm IST · checked 20 October 2026
NLMC reports successful bids for 150 plots and reschedules the remaining 216-parcel phase to 30 October, with registration by 27 October. The opportunity remains parcel-specific and investor-side; the transaction consultant is already appointed.
What changed? Added the 13 October first-phase bid results and revised 27 October registration / 30 October second-phase auction timetable. The earlier phase-two dates are superseded; original portfolio identity and publication history remain.
UttarakhandDevelopment pipeline
358.50 m · km 97.327 · NH-34 rehabilitation
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & Mobility2026_MoRTH_922259_1 · Supporting professional services · qualification under the actual RFP: Dated participation record · recorded closing 3/11/2026, 5:00:00 pm IST · checked 20 October 2026
The 358.50-m tunnel on NH-34 is the underlying rehabilitation asset. MoRTH's latest extension concerns its supporting DPR consultancy, creating a defined preparation-stage opportunity for qualified tunnel and structural-assessment teams.
Madhya PradeshDevelopment pipeline
Factory-support infrastructure · EPC Contract Mode-I
Industry, model and participation details
Defence, Aerospace & Homeland SecurityInfrastructure & Urban DevelopmentManufacturing, MSME & Industrial PolicyEPC2026_BandR_929982_1 · EPC/Construction · qualification under the actual notice: Dated participation record · recorded closing 3/11/2026, 5:30:00 pm IST · checked 20 October 2026
Bridge & Roof has issued a construction invitation for infrastructure supporting the factory’s overhaul activity. The commercial opportunity concerns the defined EPC package and contractor obligations, not a direct TLGS consultancy mandate or a disclosed project-capital estimate.
Jammu and KashmirDevelopment pipeline
New integrated terminal · allied works · apron extension
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentAirports Authority of India · Airport project and identified procurement authority2026_AAI_287844_1 · Supporting project-management services: Recorded Deadline Passed · recorded closing 23/10/2026, 6:00:00 pm IST · checked 18 October 2026
AAI’s planned integrated terminal, associated infrastructure and apron extension form the underlying development opportunity. Industry positioning should follow the airport’s implementation interfaces and actual works packages, with the management-services invitation retained as supporting context.
Tamil NaduCapital project
₹4,900crore
Approximately ₹4,900 crore · reported cost of the inaugurated stretch
Poonamallee–Vadapalani · Phase-II stretch
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentOil, Gas & PetrochemicalsManufacturing, MSME & Industrial PolicyChennai Metro Rail Limited · Metro asset organisationAn operating and lifecycle opportunity within the Chennai Metro network. The stated cost describes the completed stretch, not an open construction or design package.
Tamil NaduCapital project
₹1,620crore
Approximately ₹1,620 crore · announced whole-project cost
270,000 tonnes/year · Group II/III Lube Oil Base Stocks
Industry, model and participation details
Oil, Gas & PetrochemicalsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentTrade, Customs & Strategic Supply ChainsChennai Petroleum Corporation Limited · Project owner at Manali refineryThe 270,000-tonne-per-year Group II/III Lube Oil Base Stocks project is a defined industrial investment within the October Tamil Nadu programme. Its commercial chain runs from project execution and refinery integration to product acceptance and lubricant-market customers.
OdishaCapital project
₹335crore
₹335 crore · announced AL-31FP capacity investment, separate from Shakti
30 to 50 engines/year · capacity target
Industry, model and participation details
Defence, Aerospace & Homeland SecurityManufacturing, MSME & Industrial PolicyHindustan Aeronautics Limited · Manufacturing investment ownerThe announced expansion targets 50 engines annually from 30. This asset is separate from the second Shakti line and is not presented as an open prime procurement.
OdishaCapital project
₹218crore
₹218 crore · announced project investment
Up to 100 engines/year · target 2028–29
Industry, model and participation details
Defence, Aerospace & Homeland SecurityManufacturing, MSME & Industrial PolicyHAL · Aero-engine line developer and manufacturing organisationThe 6 October announcement sets a 2028–29 establishment target and creates a defined aero-engine manufacturing expansion to track.
What changed? Added the separately documented ₹335-crore AL-31FP capacity investment and a commercial-governance matrix. The source event remains 6 October and the Shakti asset retains its own ₹218-crore value.
Tamil NaduDevelopment pipeline
Capital dredging · Container Terminal Phase-I, Stage-II
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentOil, Gas & PetrochemicalsManufacturing, MSME & Industrial PolicyKamarajar Port Limited · Port project ownerThe foundation milestone identifies a marine infrastructure workstream distinct from the inaugurated Coal Berth-3. Verify the actual project and contract record before approaching implementation or supply roles.
Tamil NaduDevelopment pipeline
Four-lane bypass · NH-83
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentMoRTH · Sector ministry; project procurement identified separatelyThe bypass belongs to the Nagapattinam–Thanjavur corridor. Its individual design, value, land and purchasing record must remain separate from the wider highway programme.
DelhiDevelopment pipeline
5.119 acres · industrial freehold land
₹829.69 crore · auction reserve, not project capex or an independent valuation
Industry, model and participation details
Real Estate, Housing & LandManufacturing, MSME & Industrial PolicyFinancial Services, Capital Markets & InsuranceInvestment/JVHIL (India) Limited · Asset ownerNational Land Monetization Corporation · Facilitating agency for the saleHIL-NLMC-2026-industrial-land-registration · Investor registration, technical bid and EMD/BG: Dated participation record · recorded closing 19/11/2026, 2:00:00 pm IST · checked 11 October 2026
NLMC’s proposed outright sale concerns an industrial freehold parcel at Najafgarh Industrial Area, Rohtak Road, Shivaji Marg. The decision is an acquisition and development-use assessment, not participation in a consulting tender.
RajasthanCapital project
₹13,037.66crore
₹13,037.66 crore · whole Phase-II cost approved on 8 April 2026
41 km · 36 stations · Prahladpura–Todi Mod
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentPower, Energy & RenewablesManufacturing, MSME & Industrial PolicyRajasthan Metro Rail Corporation Limited · Implementing joint ventureDelhi Metro Rail Corporation · Issuing authority for JEDD-01 design procurement2026_DMRC_929158_1 · Supporting engineering services: Dated participation record · recorded closing 2/11/2026, 3:00:00 pm IST · checked 11 October 2026
The approved 41-km Prahladpura–Todi Mod corridor comprises 36 stations. Its electrical-design milestone belongs within a much wider rail, civil, power, equipment and operating ecosystem.
Approved metro project · electrical preparation milestone
Rajasthan Metro Rail Corporation Limited; DMRC for the identified design procurement
Project & commercial implications →UttarakhandDevelopment pipeline
Two-lane bypass · earlier alignment and alternatives
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityEnvironment & ClimateMoRTH · Institution named in the cited developmentRegional Office Dehradun · Institution named in the cited development2026_MoRTH_929283_1 · Supporting engineering services: Dated participation record · recorded closing 23/11/2026, 5:00:00 pm IST · checked 11 October 2026
A renewed two-lane bypass preparation exercise examines the earlier foreclosed alignment alongside alternatives. The asset opportunity depends on an adoptable route, geotechnical evidence and a deliverable construction strategy.
AssamDevelopment pipeline
106.78 km · proposed four-lane upgrade
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Institution named in the cited developmentRegional Office Guwahati · Institution named in the cited development2026_MoRTH_929297_1 · Supporting engineering services: Dated participation record · recorded closing 21/11/2026, 3:00:00 pm IST · checked 11 October 2026
The Assam corridor links Numaligarh with Lahorijan near the Nagaland border. Industry should assess the future road, structures, utilities and construction supply chain as the alignment and investment scope are developed.
MaharashtraDevelopment pipeline
96.5-km stated span · existing four-lane corridor
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityDBFOTO&M/ServicesNHAI · Authority for the identified preparation or engineering recordTwo operating four-lane highway assets have fresh engineering-support records. Their commercial relevance lies in maintenance, safety, rehabilitation and concession performance, with each corridor’s model and buyer kept separate.
KarnatakaDevelopment pipeline
189.6-km stated span · existing four-lane corridor
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityBOT–TollO&M/ServicesNHAI · Authority for the identified preparation or engineering recordTwo operating four-lane highway assets have fresh engineering-support records. Their commercial relevance lies in maintenance, safety, rehabilitation and concession performance, with each corridor’s model and buyer kept separate.
OdishaDevelopment pipeline
km 21–202 · specified bypass excluded
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Regional Office Bhubaneswar · Authority for the identified preparation or engineering recordNH-57 and the Barpalli–Junagarh section of NH-26 enter four-laning preparation, while NH-326/326A and separate southern NH-26 sections are being assessed for two lanes with paved shoulders.
OdishaDevelopment pipeline
74.287 km combined · intervening 9 km excluded
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Regional Office Bhubaneswar · Authority for the identified preparation or engineering recordNH-57 and the Barpalli–Junagarh section of NH-26 enter four-laning preparation, while NH-326/326A and separate southern NH-26 sections are being assessed for two lanes with paved shoulders.
OdishaDevelopment pipeline
131.500 km from stated chainages · two lanes with paved shoulders
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Regional Office Bhubaneswar · Authority for the identified preparation or engineering recordNH-57 and the Barpalli–Junagarh section of NH-26 enter four-laning preparation, while NH-326/326A and separate southern NH-26 sections are being assessed for two lanes with paved shoulders.
OdishaDevelopment pipeline
239.900 km · four-lane development
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Regional Office Bhubaneswar · Authority for the identified preparation or engineering recordNH-57 and the Barpalli–Junagarh section of NH-26 enter four-laning preparation, while NH-326/326A and separate southern NH-26 sections are being assessed for two lanes with paved shoulders.
Assam · BangladeshDevelopment pipeline
540-tonne inaugural shipment · Assam–Dhaka
Industry, model and participation details
Transport, Logistics & MobilityTrade, Customs & Strategic Supply ChainsOil, Gas & PetrochemicalsIWAI · Inland-waterway infrastructure and facilitation institutionAssam Petro-Chemicals Limited · Methanol producer and cargo shipperThe shipment connects Assam production with Dhaka through NW-2 and the Indo-Bangladesh Protocol Route.
MaharashtraDevelopment pipeline
Approximately 140 km · Dighi–Poladpur–Surur
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentNHAI · Tendering authority for corridor feasibility and DPR2026_NHAI_284464_1 · Corridor feasibility and DPR services: Recorded Deadline Passed · recorded closing 15/10/2026, 11:00:00 am IST · checked 11 October 2026
The proposed Maharashtra corridor links Dighi Port with NH-48; its current engineering-services window runs to 15 October 2026.
Andhra PradeshDevelopment pipeline
FSS programme · 45,000-DWT-capable slipway
Industry, model and participation details
Defence, Aerospace & Homeland SecurityTransport, Logistics & MobilityInfrastructure & Urban DevelopmentHindustan Shipyard Limited · Shipbuilder and yard infrastructure ownerIndian Navy · Intended fleet-support vessel operatorThe first Fleet Support Ship entered the water on 6 October; the fifth ship’s keel and upgraded lifting infrastructure mark separate execution milestones.
What changed? Added a separate yard-services and commercial-delivery matrix; the previously published 6 October milestones and project stage are unchanged.
BiharDevelopment pipeline
3×800 MW expansion · integrated rail siding
Industry, model and participation details
Power, Energy & RenewablesTransport, Logistics & MobilityInfrastructure & Urban DevelopmentNTPC · Project and consultancy procurement authorityNTPC-CS-0371-350-9 · Railway DPR, detailed engineering and PMC: Recorded Deadline Passed · recorded closing 8/10/2026, 6:30:00 pm IST · checked 8 October 2026
NTPC’s railway-siding assignment integrates DPR, detailed engineering and project management with electrification and signalling.
KarnatakaDevelopment pipeline
Three facility scopes · Bengaluru and Mangaluru
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityNBCC (India) Limited · Architectural and engineering consultancy tendering entityNMPA · Institution identified in the facilities programme reference2026_NBCC_851677_2 · Architectural and engineering consultancy: Recorded Deadline Passed · recorded closing 10/10/2026, 3:00:00 pm IST · checked 8 October 2026
NBCC’s assignment covers the Trade Promotion Centre in Bengaluru, the BDC Building in Mangaluru and administrative-space revamping.
IndiaDevelopment pipeline
Grid-connected sodium-ion BESS pilot
Industry, model and participation details
Power, Energy & RenewablesDigital, Telecom & ElectronicsNTPC · Pilot EOI issuer and prospective demonstration hostThe EOI offers a platform to assess sodium-ion battery integration, with a recorded response date of 15 October.
MaharashtraDevelopment pipeline
Vadhvan Port · environmental and social advisory
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentEnvironment & ClimateVadhvan Port Project Limited · Port project entity and consultancy tendering authority2026_VPPL_288465_1 · Environmental and social consultancy: Recorded Deadline Passed · recorded closing 23/10/2026, 3:00:00 pm IST · checked 8 October 2026
The specialist consultancy’s current submission deadline is 23 October, with opening recorded for 26 October.
KarnatakaDevelopment pipeline
AI Vision SoC · TRL-5 to TRL-9 target
Industry, model and participation details
Digital, Telecom & ElectronicsAI, Cybersecurity & Data GovernanceDefence, Aerospace & Homeland SecurityBigEndian · Technology developer and project recipientTechnology Development Board · RDI financing institutionTDB’s ₹130-crore optionally convertible debt support backs BigEndian’s move from TRL-5 toward commercial readiness.
Andaman SeaDevelopment pipeline
More than 1,632 sq km · two offshore blocks
Industry, model and participation details
Mining, Metals & Critical MineralsPower, Energy & RenewablesInvestment/JVTechnology PartnershipMinistry of Mines · Administering and auction authoritySewell Rise-01 / West Sewell Ridge-01 · Composite-licence auction: Dated participation record · recorded closing 28/12/2026, 5:00:00 pm IST · checked 4 October 2026
Sewell Rise-01 and West Sewell Ridge-01 open a strategic exploration pathway across more than 1,632 square kilometres.
KarnatakaDevelopment pipeline
Corridor-2 Package-1 · Corridor-4 ROB/RUB works
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentO&M/ServicesRail Infrastructure Development Company (Karnataka) Limited · Implementing authority2026_KRIDE_286419_1 · Engineering services: Recorded Deadline Passed · recorded closing 14/10/2026, 3:00:00 pm IST · checked 18 October 2026
The asset remains the focus; the engineering invitation is a separately identified participation window.
RajasthanDevelopment pipeline
Proposed expressway corridor
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentO&M/ServicesNational Highways Authority of India · Implementing authority2026_NHAI_292987_1 · Engineering services: Recorded Deadline Passed · recorded closing 29/10/2026, 11:00:00 am IST · checked 26 October 2026
The asset remains the focus; the engineering invitation is a separately identified participation window.
What changed? Recorded the 21 October Corrigendum II extending the supporting DPR submission to 29 October and opening to 30 October. The underlying project scope, original event and publication dates, capital basis and material-update date are unchanged.
DelhiCapital project
₹1,789.52crore
₹1,789.52 crore · approved project estimate
42 corridors · 1,092 signal and 1,029 enforcement locations
Industry, model and participation details
AI, Cybersecurity & Data GovernanceTransport, Logistics & MobilityDigital, Telecom & ElectronicsEquipment SupplyTechnology PartnershipO&M/ServicesDelhi Police · Implementing authorityAdaptive traffic control, enforcement and command infrastructure form a phased technology implementation programme.
West BengalDevelopment pipeline
Six-lane alignment · 7.5 km connection and 18.5 km corridor
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentO&M/ServicesNational Highways Authority of India · Implementing authority2026_NHAI_286566_1 · Engineering services: Recorded Deadline Passed · recorded closing 12/10/2026, 11:00:00 am IST · checked 4 October 2026
The asset remains the focus; the engineering invitation is a separately identified participation window.
Madhya PradeshDevelopment pipeline
NH752B / NH347C and NH43 / NH543 / NH45
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentO&M/ServicesMinistry of Road Transport and Highways · Procuring authority / Regional Office2026_MoRTH_923662_1 · Engineering services: Recorded Deadline Passed · recorded closing 7/10/2026, 5:30:00 pm IST · checked 4 October 2026
2026_MoRTH_923598_1 · Engineering services: Recorded Deadline Passed · recorded closing 7/10/2026, 5:30:00 pm IST · checked 4 October 2026
Asset-specific engineering routes support corridor development and delivery decisions.
KarnatakaDevelopment pipeline
Six-lane NH48 corridors
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentO&M/ServicesNational Highways Authority of India · Implementing authority2026_NHAI_289532_1 · Engineering services: Recorded Deadline Passed · recorded closing 16/10/2026, 3:00:00 pm IST · checked 4 October 2026
The asset remains the focus; the engineering invitation is a separately identified participation window.
UttarakhandDevelopment pipeline
311 km · two separate preparation packages
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentO&M/ServicesMinistry of Road Transport and Highways · Procuring authority / Regional Office2026_MoRTH_914977_1 · Engineering services: Dated participation record · recorded closing 3/11/2026, 5:00:00 pm IST · checked 20 October 2026
2026_MoRTH_914262_1 · Engineering services: Recorded Deadline Passed · recorded closing 5/10/2026, 5:00:00 pm IST · checked 4 October 2026
Asset-specific engineering routes support corridor development and delivery decisions.
What changed? Recorded the 19 October Corrigendum-7 extending only the Tyuni–Bataghat supporting consultancy to 3 November, with opening on 4 November. The separate Bataghat–Maletha notice, underlying asset, event date and publication freshness are unchanged.
Tamil NaduDevelopment pipeline
Four-lane access-controlled bypass · design km 135.796–158.506
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentO&M/ServicesMinistry of Road Transport and Highways · Procuring authority / Regional Office2026_MoRTH_924639_1 · Engineering services: Recorded Deadline Passed · recorded closing 27/10/2026, 3:00:00 pm IST · checked 4 October 2026
Asset-specific engineering routes support corridor development and delivery decisions.
Odisha · Gujarat · India · United Arab EmiratesDevelopment pipeline
US$11.5 billion · stated joint investment intention for an integrated Odisha aluminium complex
Industry, model and participation details
Trade, Customs & Strategic Supply ChainsMining, Metals & Critical MineralsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityFinancial Services, Capital Markets & InsuranceIndia–UAE High Level Joint Task Force on Investments · Institution named in source recordMinistry of Commerce and Industry · Institution named in source recordThe Joint Task Force review connects an Odisha aluminium investment intention with exploratory Dholera aviation and logistics discussions and financial cooperation. Industry should convert each track into a separate, commercially credible project proposition.
Investment intention and cooperation tracks · no prime award implied
Identified project sponsors through the India–UAE investment-cooperation framework
Project & commercial implications →JharkhandDevelopment pipeline
128.098 km combined · two four-laning sections
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · Institution named in source recordPIU Daltonganj · Institution named in source recordThe Shildag–Parwa More and Jharkhand–Bihar border–Chandwa sections establish a highway-development pipeline of approximately 128.098 km. Industry positioning should focus on the future road assets, construction interfaces and delivery model as project preparation advances.
Uttar Pradesh · Varanasi DivisionCapital project
₹223crore
₹223 crore · approved divisional deployment scope
614.75 route-km · Kavach Version 4.0
Industry, model and participation details
Transport, Logistics & MobilityDigital, Telecom & ElectronicsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentMinistry of Railways · Institution named in source recordNorth Eastern Railway · Institution named in source recordVaranasi Division · Institution named in source recordThe approved Kavach 4.0 scope covers 614.75 route-km of North Eastern Railway’s Varanasi Division. Qualified businesses should prepare for package-level procurement and integration responsibilities rather than treat approval as an immediately available equipment order.
AssamDevelopment pipeline
Second parallel tube · CH 138 · Assam
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · Authority named in project recordThe Assam project develops a second tube beside the existing tunnel. Candidate work follows the approved civil, approach, system and operating interfaces, not the value of its preparation consultancy.
ChhattisgarhCapital project
₹5,427crore
₹5,427 crore · integrated commissioned asset chain, not new tender value
2-MTPA pellet plant · 15-MTPA, 135-km slurry pipeline · processing facilities
Industry, model and participation details
Mining, Metals & Critical MineralsManufacturing, MSME & Industrial PolicyTransport, Logistics & MobilityInfrastructure & Urban DevelopmentNMDC · Institution named in source recordMinistry of Steel · Institution named in source recordThe Bacheli processing facilities, 135-km slurry pipeline and Nagarnar pellet plant form an integrated mining-to-steel feedstock system. Commissioning makes operating performance, industrial services and downstream customer relationships the relevant commercial focus.
Gujarat · AssamCapital project
₹2,300crore
₹2,300 crore · total announced project investment
150 tonnes per day · two phases
Industry, model and participation details
Oil, Gas & PetrochemicalsPower, Energy & RenewablesTransport, Logistics & MobilityEnvironment & ClimateInfrastructure & Urban DevelopmentDeendayal Port Authority · Institution named in source recordDPA · Institution named in source recordAssam Petro-Chemicals Limited · Institution named in source recordAPCL · Institution named in source recordMoPSW · Institution named in source recordThe 150-tonne-per-day DPA–APCL project has reached foundation stage. Its commercial significance extends from production equipment to renewable inputs, storage, marine-fuel logistics and customer acceptance.
Jammu & KashmirDevelopment pipeline
Four lanes with paved shoulders · Achhabal and Bijbehara spurs
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Institution named in source recordRegional Office Chandigarh · Institution named in source recordThe proposed upgrade from the NH-44/Alstop interface towards Pahalgam, with Achhabal and Bijbehara spurs, is an asset-development opportunity spanning highway works, structures, safety and connectivity interfaces.
What changed? Rechecked the existing NH-501 preparation notice: the previously recorded 26 October 15:00 IST closing date remains, with opening recorded for 27 October 15:30. This is not a deadline extension, construction award or new investment approval; original article text and project freshness are preserved.
IndiaDevelopment pipeline
Provider registry · secure data environment · claims infrastructure
Industry, model and participation details
Healthcare, Pharma & Life SciencesAI, Cybersecurity & Data GovernanceDigital, Telecom & ElectronicsFinancial Services, Capital Markets & InsuranceNational Health Authority · Institution named in source recordNHA · Institution named in source recordIISc Bengaluru · Institution named in source recordThe new provider-registry, secure-data and claims tools create implementation questions for hospitals, payers and health-technology businesses. The opportunity lies in interoperability, evidence quality, workflow integration and accountable use of data.
Madhya Pradesh · IndiaDevelopment pipeline
SAF pathway evaluation · refinery integration
Industry, model and participation details
Oil, Gas & PetrochemicalsPower, Energy & RenewablesTrade, Customs & Strategic Supply ChainsEnvironment & ClimateEngineers India Limited · Institution named in source recordEIL · Institution named in source recordBPCL · Institution named in source recordEIL’s evaluation of Alcohol-to-Jet and other sustainable aviation-fuel pathways for BPCL’s Bina Refinery opens a project-development channel for licensors and process partners. Feedstock, certification, integration and bankability should be assessed together.
Northeast India · AssamDevelopment pipeline
RCC community jetties · five National Waterways
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentEnvironment & ClimateInland Waterways Authority of India · Institution named in source recordIWAI · Institution named in source recordRO Guwahati · Institution named in source record2026_IWAI_927266_1 · Engineering services: Recorded Deadline Passed · recorded closing 13/10/2026, 3:00:00 pm IST · checked 28 September 2026
RCC community-jetty development across five National Waterways: civil infrastructure, landside access, utilities and future operating services.
MaharashtraDevelopment pipeline
47.8 km · three adjoining sections
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Institution named in source recordMaharashtra PWD · Institution named in source recordNational Highway Division Latur · Institution named in source recordThree adjoining sections establish a 47.8-km highway-development pipeline in Maharashtra. The commercial focus is the future road asset, its engineering and land interfaces, and eventual construction and supply packages.
GujaratDevelopment pipeline
61.658 km · two lanes with paved shoulders
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Institution named in source recordRegional Office Gandhinagar · Institution named in source recordThe proposed two-lane-with-paved-shoulders upgrade connects the NH-53/Songarh junction to Ahwa. The project-development stage creates an early positioning window for construction, structures, drainage, safety and supporting services.
India · RajasthanDevelopment pipeline
20-mK research-equipment development
Industry, model and participation details
Digital, Telecom & ElectronicsManufacturing, MSME & Industrial PolicyDefence, Aerospace & Homeland SecurityEducation & SkillsDRDO · Institution named in source recordTechnology Development Fund · Institution named in source recordZero mK India · Institution named in source recordDRDO’s TDF agreement with Zero mK India concerns a 20-mK dilution refrigerator for quantum applications. The business lens is research commercialisation, specialised equipment capability and lawful technology partnerships—not a ₹500-crore project award.
West BengalDevelopment pipeline
Gazole–Hili: 106.607 km · additional NH-517/NH-17 corridors
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Institution named in source recordRegional Office Kolkata · Institution named in source record2026_MoRTH_927429_1 · Engineering services: Dated participation record · recorded closing 6/11/2026, 3:00:00 pm IST · checked 28 September 2026
2026_MoRTH_927436_1 · Engineering services: Dated participation record · recorded closing 6/11/2026, 3:00:00 pm IST · checked 28 September 2026
The four-laning pipeline comprises the 106.607-km Gazole–Hili corridor and the Telipara–Jhumur/Birpara–Falakata network. DPR procurement marks project preparation; industry positioning should focus on the eventual road assets and implementation packages.
AssamCapital project
₹48,000crore
₹48,000 crore · announced project investment
3,200 MW · 4 × 800 MW
Industry, model and participation details
Power, Energy & RenewablesInfrastructure & Urban DevelopmentManufacturing, MSME & Industrial PolicyTransport, Logistics & MobilityAdani Power · Institution named in source recordAssam Power Distribution Company Limited · Institution named in source recordAPDCL · Institution named in source recordAdani Power’s 3,200-MW Chapar project creates a client-side ecosystem for engineering, equipment, logistics and industrial services. The commercial task is to identify the purchasing entity, work package and qualification route—not treat the project announcement as a fresh EPC tender.
Madhya PradeshDevelopment pipeline
170 acres · Phase I industrial cluster
Industry, model and participation details
Digital, Telecom & ElectronicsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentTrade, Customs & Strategic Supply ChainsDepartment of Telecommunications · Institution named in source recordDoT · Institution named in source recordGovernment of Madhya Pradesh · Institution named in source recordThe proposed telecom cluster is moving through investor applications and site development. Manufacturers should connect their land requirement with production economics, utilities, product qualification and a documented incentive pathway.
Jammu & Kashmir · Himachal Pradesh · Nagaland · TripuraDevelopment pipeline
J&K · Himachal Pradesh · Nagaland · Tripura
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityEnvironment & ClimateNHLML / NHAI and the responsible state institutions · Authority named in project recordJammu & Kashmir, Himachal Pradesh, Nagaland and Tripura form a site-based ropeway-development pipeline. Assess demand, terminal access, qualified technology partners, approvals and sustainable operations before investment.
Telangana · India · Southeast AsiaDevelopment pipeline
Cloud region operational · three availability zones
Industry, model and participation details
AI, Cybersecurity & Data GovernanceDigital, Telecom & ElectronicsPower, Energy & RenewablesInfrastructure & Urban DevelopmentTrade, Customs & Strategic Supply ChainsMicrosoft · Institution named in source recordMicrosoft’s India South Central region brings an operating cloud platform into a wider infrastructure and enterprise-services market. The business opportunity spans reliable utilities, connectivity, workload governance, integration and lifecycle support.
GujaratDevelopment pipeline
Approximately 126 km · two distinct preparation scopes
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · PIU Vadodara · Authority named in project recordApproximately 75 km of ring road and 51 km of Makarpura–Borsad development. Track alignment, land, structures, utilities and the subsequent investment and works-packaging decisions.
IndiaCapital project
₹25,015.89crore
₹25,015.89 crore · project estimate
0.66 MMTPA · ammonium nitrate
Industry, model and participation details
Mining, Metals & Critical MineralsPower, Energy & RenewablesOil, Gas & PetrochemicalsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentBharat Coal Gasification & Chemicals Ltd. · Authority named in project recordA separately identified capital project within CIL’s coal-to-chemicals portfolio. Assess process integration, utilities, commercial partnerships and package-level procurement through the project entity.
IndiaCapital project
₹12,214.86crore
₹12,214.86 crore · project estimate
633.6 million Nm³/year · SNG
Industry, model and participation details
Mining, Metals & Critical MineralsPower, Energy & RenewablesOil, Gas & PetrochemicalsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentCIL / BPCL · Authority named in project recordA separately identified capital project within CIL’s coal-to-chemicals portfolio. Assess process integration, utilities, commercial partnerships and package-level procurement through the project entity.
IndiaCapital project
₹13,052.81crore
₹13,052.81 crore · project estimate
633.6 million Nm³/year · SNG
Industry, model and participation details
Mining, Metals & Critical MineralsPower, Energy & RenewablesOil, Gas & PetrochemicalsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentCoal Gas India Ltd. · Authority named in project recordA separately identified capital project within CIL’s coal-to-chemicals portfolio. Assess process integration, utilities, commercial partnerships and package-level procurement through the project entity.
IndiaCapital project
₹19,062.22crore
₹19,062.22 crore · project estimate
1.27 MMTPA · urea
Industry, model and participation details
Mining, Metals & Critical MineralsPower, Energy & RenewablesOil, Gas & PetrochemicalsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentTalcher Fertilizers Ltd. · Authority named in project recordA separately identified capital project within CIL’s coal-to-chemicals portfolio. Assess process integration, utilities, commercial partnerships and package-level procurement through the project entity.
MaharashtraDevelopment pipeline
Final concession documents to verify
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · Authority named in project recordNHAI tender 2026_NHAI_277028_1 describes a six-lane access-controlled greenfield highway from Adgaon at kilometre 138 to Ahilyanagar at kilometre 290.
MaharashtraCapital project
₹9,030.38crore
₹9,030.38 crore · notice value
Concession / highway development; final RFP governs
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · Authority named in project recordNHAI notice 2026_NHAI_277031_1 covers a six-lane access-controlled greenfield highway from Ahilyanagar to Hasapur, kilometre 290 to 512, in Maharashtra. The published tender value is ₹9,030.38 crore.
TelanganaDevelopment pipeline
HAM
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · Authority named in project recordNHAI’s organisation list includes tender 2026_NHAI_278192_1 for the northern expressway’s Girmapur–Pragnapur Package I.
TelanganaCapital project
₹3,727.32crore
₹3,727.32 crore · notice value
HAM
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · Authority named in project recordPackage II runs from Pragnapur at kilometre 82 to Tangad Palle at kilometre 160 under the Hybrid Annuity Model. NHAI records a tender value of ₹3,727.32 crore.
MaharashtraCapital project
₹3,653.09crore
₹3,653.09 crore · notice value
BOT (Toll)
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityBOT–TollNHAI · Authority named in project recordThe successor NHAI tender 2025_NHAI_244402_1 concerns a 29.219 kilometre six-lane Pagote–Chowk highway in Maharashtra under BOT (Toll), with a recorded value of ₹3,653.09 crore.
IndiaDevelopment pipeline
700 MW
Industry, model and participation details
Power, Energy & RenewablesManufacturing, MSME & Industrial PolicyTrade, Customs & Strategic Supply ChainsSECI · Authority named in project recordSECI’s C&I-1 RfS seeks 700 MW of ISTS-connected solar capacity for projects within an SEZ or as an export-oriented unit. References include SECI/C&P/IPP/15/0009/26-27 and CPPP 2026_SECI_850226_1.
Varanasi, Uttar PradeshCapital project
₹10,998.32crore
₹10,998.32 crore · announced project
HAM · as described in government announcement
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityGovernment of India / Road infrastructure authorities · Authority named in project recordThe government’s New India Samachar issue for 1–15 August 2026 describes a six/four-lane elevated Varuna corridor with ramps and loops, connecting the NH-31 side to Kashi railway station.
Arunachal PradeshCapital project
₹2,248.94crore
₹2,248.94 crore · Lada–Sarli packages 1, 2, 3 and 6 approved in February 2024; not the whole corridor
105.59 km sanctioned Lada–Sarli subset · wider NH-913 section tracking
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Institution named in source recordRegional Office Itanagar · Institution named in source record2026_MoRTH_905015_1 · Engineering services: Recorded Deadline Passed · recorded closing 30/9/2026, 11:00:00 am IST · checked 30 September 2026
2026_MoRTH_905009_1 · Engineering services: Recorded Deadline Passed · recorded closing 30/9/2026, 11:00:00 am IST · checked 30 September 2026
2026_MoRTH_904999_1 · Engineering services: Recorded Deadline Passed · recorded closing 30/9/2026, 11:00:00 am IST · checked 30 September 2026
2026_MoRTH_904991_1 · Engineering services: Recorded Deadline Passed · recorded closing 30/9/2026, 11:00:00 am IST · checked 30 September 2026
The NH-913 implementation map spans Huri–Taliha, Bile–Migging, Lada–Sarli and Bomdila–Nafra–Lada sections. A historical ₹2,248.94-crore approval identifies a defined Lada–Sarli subset; current engineering appointments provide a separate view of implementation responsibilities.
Implementation-support records · dated capital approval for specified Lada–Sarli works
MoRTH · Regional Office Itanagar and the respective implementing entities
Project & commercial implications →Tamil NaduCapital project
₹1,423.5crore
₹1,423.50 crore · whole-park project value disclosed in March 2023
184.27 acres · park linked to Kadambattur Railway Station
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityManufacturing, MSME & Industrial PolicyTrade, Customs & Strategic Supply ChainsNHLML · Institution named in source recordNHAI · Institution named in source recordChennai MMLP · Institution named in source recordThe Kadambattur connection belongs within the wider Chennai multimodal logistics park investment. The opportunity extends beyond track works to terminals, warehousing, equipment, cargo services and the commercial use of a connected logistics asset.
GujaratCapital project
₹873.62crore
₹873.62 crore · balance-works estimate, not an awarded amount
26.6 km · km 128.0–154.6 · eight-lane EPC balance works
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · PIU Surat · Authority named in project recordA 26.6-km, eight-lane EPC balance-works package. Assess remaining civil and systems scope, existing-asset interfaces and the actual purchasing route; this estimate is not the entire expressway investment.
MaharashtraCapital project
₹821.05crore
₹821.05 crore · historical notice estimate for the identified works scope
9.66 km · km 0.050–9.710 · HAM elevated corridor
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityHAMNHAI · Authority named in project recordFour-lane elevated infrastructure and approaches on the Old Pune Naka–Boramani Naka section. Assess HAM and construction interfaces, urban delivery conditions and package-specific purchasing; the estimate is separate from a final award.
Project estimates are identified by scope and source. Consultancy fees, programme funding and a company’s wider investment commitment are not ranked as individual project capex. Project visibility continues beyond preparation-procurement deadlines.