MaharashtraCapital project
₹13,500crore
Approximately ₹13,500 crore · Phase-II announcement, 2 November 2026
Four corridors · approximately 44.4 km · 41 stations across the earlier approvals
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentManufacturing, MSME & Industrial PolicyThe foundation-stone milestone on 3 November shifts attention to the delivery interfaces of lines 2A, 2B, 4 and 4A. The separately inaugurated Line 3 belongs to the operating-network story, not the fresh Phase-II procurement pipeline.
RajasthanCapital project
₹13,037.66crore
₹13,037.66 crore · whole Phase-II cost approved on 8 April 2026
41 km · 36 stations · Prahladpura–Todi Mod
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentPower, Energy & RenewablesManufacturing, MSME & Industrial PolicyRajasthan Metro Rail Corporation Limited · Implementing joint ventureDelhi Metro Rail Corporation · Issuing authority for JEDD-01 design procurement2026_DMRC_929158_1 · Supporting engineering services: Recorded Deadline Passed · recorded closing 2/11/2026, 3:00:00 pm IST · checked 11 October 2026
The approved 41-km Prahladpura–Todi Mod corridor comprises 36 stations. Its electrical-design milestone belongs within a much wider rail, civil, power, equipment and operating ecosystem.
Approved metro project · electrical preparation milestone
Rajasthan Metro Rail Corporation Limited; DMRC for the identified design procurement
Project & commercial implications →DelhiCapital project
₹1,789.52crore
₹1,789.52 crore · approved project estimate
42 corridors · 1,092 signal and 1,029 enforcement locations
Industry, model and participation details
AI, Cybersecurity & Data GovernanceTransport, Logistics & MobilityDigital, Telecom & ElectronicsEquipment SupplyTechnology PartnershipO&M/ServicesDelhi Police · Implementing authorityAdaptive traffic control, enforcement and command infrastructure form a phased technology implementation programme.
Uttar Pradesh · Varanasi DivisionCapital project
₹223crore
₹223 crore · approved divisional deployment scope
614.75 route-km · Kavach Version 4.0
Industry, model and participation details
Transport, Logistics & MobilityDigital, Telecom & ElectronicsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentMinistry of Railways · Institution named in source recordNorth Eastern Railway · Institution named in source recordVaranasi Division · Institution named in source recordThe approved Kavach 4.0 scope covers 614.75 route-km of North Eastern Railway’s Varanasi Division. Qualified businesses should prepare for package-level procurement and integration responsibilities rather than treat approval as an immediately available equipment order.
Project estimates are identified by scope and source. Consultancy fees, programme funding and a company’s wider investment commitment are not ranked as individual project capex. Project visibility continues beyond preparation-procurement deadlines.