MaharashtraCapital project
₹13,500crore
Approximately ₹13,500 crore · Phase-II announcement, 2 November 2026
Four corridors · approximately 44.4 km · 41 stations across the earlier approvals
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentManufacturing, MSME & Industrial PolicyThe foundation-stone milestone on 3 November shifts attention to the delivery interfaces of lines 2A, 2B, 4 and 4A. The separately inaugurated Line 3 belongs to the operating-network story, not the fresh Phase-II procurement pipeline.
BiharCapital project
₹1,339crore
₹1,339 crore · approved 28 August 2024, including land cost
1,670 acres · Dobhi, Gaya · AKIC industrial cluster
Industry, model and participation details
Manufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentReal Estate, Housing & LandAgriculture, Food Processing & Rural EconomyThe 1,670-acre IMC Gaya combines an approved ₹1,339-crore infrastructure project with a new investor-facilitation milestone. The October MoUs concern prospective manufacturing investment; they are separate from the cluster budget and from trunk-infrastructure contracts already appointed.
Trunk infrastructure under execution · new investor MoUs and allotment portal
Bihar Integrated Manufacturing City Gaya Limited — BIADA / NICDIT joint venture
Project & commercial implications →OdishaCapital project
₹35,000crore
₹35,000 crore · potential investment stated in the 22 October MoU announcement
4 × 800 MW · proposed ultra-supercritical coal-based plant
Industry, model and participation details
Power, Energy & RenewablesMining, Metals & Critical MineralsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentNLC India Limited · Project proponentIndustrial Promotion and Investment Corporation of Odisha Limited · State investment-promotion counterpartNLC India’s IPICOL agreements identify a proposed 3,200-MW thermal plant, a beach-sand processing facility and gasification-linked fertiliser exploration. Each has a different development basis; the announced investment intentions do not constitute one sanctioned project or an open EPC procurement.
OdishaCapital project
₹2,000crore
₹2,000 crore · tentative investment stated in the 22 October MoU announcement
Mineral-processing facility · site and throughput not specified
Industry, model and participation details
Power, Energy & RenewablesMining, Metals & Critical MineralsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentNLC India Limited · Project proponentIndustrial Promotion and Investment Corporation of Odisha Limited · State investment-promotion counterpartNLC India’s IPICOL agreements identify a proposed 3,200-MW thermal plant, a beach-sand processing facility and gasification-linked fertiliser exploration. Each has a different development basis; the announced investment intentions do not constitute one sanctioned project or an open EPC procurement.
MaharashtraCapital project
₹922.67crore
₹922.67 crore · official estimated project cost
37.3-hectare protected water area · 424 Phase-I berths · 604 at full build-out
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentFinancial Services, Capital Markets & InsuranceDBFOTPPPMumbai Port Authority’s ₹922.67-crore project combines a protected marina with hospitality, yacht services and waterfront activity. The concessionaire’s investment case must distinguish the marine works already commenced by the Port from landside development, later berth expansion and long-term operations.
Ladakh · Himachal PradeshCapital project
₹2,500crore
₹2,500 crore · reported cost of the inaugurated road
298 km · completed road connectivity
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityBorder Roads Organisation · Road implementing organisationThe completed BRO corridor provides a defined connectivity asset. Its reported cost is distinct from a new works procurement; operating-service opportunities require their own purchaser and contract.
Tamil NaduCapital project
₹4,900crore
Approximately ₹4,900 crore · reported cost of the inaugurated stretch
Poonamallee–Vadapalani · Phase-II stretch
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentOil, Gas & PetrochemicalsManufacturing, MSME & Industrial PolicyChennai Metro Rail Limited · Metro asset organisationAn operating and lifecycle opportunity within the Chennai Metro network. The stated cost describes the completed stretch, not an open construction or design package.
Tamil NaduCapital project
₹1,620crore
Approximately ₹1,620 crore · announced whole-project cost
270,000 tonnes/year · Group II/III Lube Oil Base Stocks
Industry, model and participation details
Oil, Gas & PetrochemicalsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentTrade, Customs & Strategic Supply ChainsChennai Petroleum Corporation Limited · Project owner at Manali refineryThe 270,000-tonne-per-year Group II/III Lube Oil Base Stocks project is a defined industrial investment within the October Tamil Nadu programme. Its commercial chain runs from project execution and refinery integration to product acceptance and lubricant-market customers.
RajasthanCapital project
₹13,037.66crore
₹13,037.66 crore · whole Phase-II cost approved on 8 April 2026
41 km · 36 stations · Prahladpura–Todi Mod
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentPower, Energy & RenewablesManufacturing, MSME & Industrial PolicyRajasthan Metro Rail Corporation Limited · Implementing joint ventureDelhi Metro Rail Corporation · Issuing authority for JEDD-01 design procurement2026_DMRC_929158_1 · Supporting engineering services: Recorded Deadline Passed · recorded closing 2/11/2026, 3:00:00 pm IST · checked 11 October 2026
The approved 41-km Prahladpura–Todi Mod corridor comprises 36 stations. Its electrical-design milestone belongs within a much wider rail, civil, power, equipment and operating ecosystem.
Approved metro project · electrical preparation milestone
Rajasthan Metro Rail Corporation Limited; DMRC for the identified design procurement
Project & commercial implications →DelhiCapital project
₹1,789.52crore
₹1,789.52 crore · approved project estimate
42 corridors · 1,092 signal and 1,029 enforcement locations
Industry, model and participation details
AI, Cybersecurity & Data GovernanceTransport, Logistics & MobilityDigital, Telecom & ElectronicsEquipment SupplyTechnology PartnershipO&M/ServicesDelhi Police · Implementing authorityAdaptive traffic control, enforcement and command infrastructure form a phased technology implementation programme.
ChhattisgarhCapital project
₹5,427crore
₹5,427 crore · integrated commissioned asset chain, not new tender value
2-MTPA pellet plant · 15-MTPA, 135-km slurry pipeline · processing facilities
Industry, model and participation details
Mining, Metals & Critical MineralsManufacturing, MSME & Industrial PolicyTransport, Logistics & MobilityInfrastructure & Urban DevelopmentNMDC · Institution named in source recordMinistry of Steel · Institution named in source recordThe Bacheli processing facilities, 135-km slurry pipeline and Nagarnar pellet plant form an integrated mining-to-steel feedstock system. Commissioning makes operating performance, industrial services and downstream customer relationships the relevant commercial focus.
Gujarat · AssamCapital project
₹2,300crore
₹2,300 crore · total announced project investment
150 tonnes per day · two phases
Industry, model and participation details
Oil, Gas & PetrochemicalsPower, Energy & RenewablesTransport, Logistics & MobilityEnvironment & ClimateInfrastructure & Urban DevelopmentDeendayal Port Authority · Institution named in source recordDPA · Institution named in source recordAssam Petro-Chemicals Limited · Institution named in source recordAPCL · Institution named in source recordMoPSW · Institution named in source recordThe 150-tonne-per-day DPA–APCL project has reached foundation stage. Its commercial significance extends from production equipment to renewable inputs, storage, marine-fuel logistics and customer acceptance.
AssamCapital project
₹48,000crore
₹48,000 crore · announced project investment
3,200 MW · 4 × 800 MW
Industry, model and participation details
Power, Energy & RenewablesInfrastructure & Urban DevelopmentManufacturing, MSME & Industrial PolicyTransport, Logistics & MobilityAdani Power · Institution named in source recordAssam Power Distribution Company Limited · Institution named in source recordAPDCL · Institution named in source recordAdani Power’s 3,200-MW Chapar project creates a client-side ecosystem for engineering, equipment, logistics and industrial services. The commercial task is to identify the purchasing entity, work package and qualification route—not treat the project announcement as a fresh EPC tender.
IndiaCapital project
₹25,015.89crore
₹25,015.89 crore · project estimate
0.66 MMTPA · ammonium nitrate
Industry, model and participation details
Mining, Metals & Critical MineralsPower, Energy & RenewablesOil, Gas & PetrochemicalsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentBharat Coal Gasification & Chemicals Ltd. · Authority named in project recordA separately identified capital project within CIL’s coal-to-chemicals portfolio. Assess process integration, utilities, commercial partnerships and package-level procurement through the project entity.
IndiaCapital project
₹12,214.86crore
₹12,214.86 crore · project estimate
633.6 million Nm³/year · SNG
Industry, model and participation details
Mining, Metals & Critical MineralsPower, Energy & RenewablesOil, Gas & PetrochemicalsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentCIL / BPCL · Authority named in project recordA separately identified capital project within CIL’s coal-to-chemicals portfolio. Assess process integration, utilities, commercial partnerships and package-level procurement through the project entity.
IndiaCapital project
₹13,052.81crore
₹13,052.81 crore · project estimate
633.6 million Nm³/year · SNG
Industry, model and participation details
Mining, Metals & Critical MineralsPower, Energy & RenewablesOil, Gas & PetrochemicalsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentCoal Gas India Ltd. · Authority named in project recordA separately identified capital project within CIL’s coal-to-chemicals portfolio. Assess process integration, utilities, commercial partnerships and package-level procurement through the project entity.
IndiaCapital project
₹19,062.22crore
₹19,062.22 crore · project estimate
1.27 MMTPA · urea
Industry, model and participation details
Mining, Metals & Critical MineralsPower, Energy & RenewablesOil, Gas & PetrochemicalsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentTalcher Fertilizers Ltd. · Authority named in project recordA separately identified capital project within CIL’s coal-to-chemicals portfolio. Assess process integration, utilities, commercial partnerships and package-level procurement through the project entity.
MaharashtraCapital project
₹9,030.38crore
₹9,030.38 crore · notice value
Concession / highway development; final RFP governs
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · Authority named in project recordNHAI notice 2026_NHAI_277031_1 covers a six-lane access-controlled greenfield highway from Ahilyanagar to Hasapur, kilometre 290 to 512, in Maharashtra. The published tender value is ₹9,030.38 crore.
TelanganaCapital project
₹3,727.32crore
₹3,727.32 crore · notice value
HAM
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · Authority named in project recordPackage II runs from Pragnapur at kilometre 82 to Tangad Palle at kilometre 160 under the Hybrid Annuity Model. NHAI records a tender value of ₹3,727.32 crore.
MaharashtraCapital project
₹3,653.09crore
₹3,653.09 crore · notice value
BOT (Toll)
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityBOT–TollNHAI · Authority named in project recordThe successor NHAI tender 2025_NHAI_244402_1 concerns a 29.219 kilometre six-lane Pagote–Chowk highway in Maharashtra under BOT (Toll), with a recorded value of ₹3,653.09 crore.
Varanasi, Uttar PradeshCapital project
₹10,998.32crore
₹10,998.32 crore · announced project
HAM · as described in government announcement
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityGovernment of India / Road infrastructure authorities · Authority named in project recordThe government’s New India Samachar issue for 1–15 August 2026 describes a six/four-lane elevated Varuna corridor with ramps and loops, connecting the NH-31 side to Kashi railway station.
Arunachal PradeshCapital project
₹2,248.94crore
₹2,248.94 crore · Lada–Sarli packages 1, 2, 3 and 6 approved in February 2024; not the whole corridor
105.59 km sanctioned Lada–Sarli subset · wider NH-913 section tracking
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Institution named in source recordRegional Office Itanagar · Institution named in source record2026_MoRTH_905015_1 · Engineering services: Recorded Deadline Passed · recorded closing 30/9/2026, 11:00:00 am IST · checked 30 September 2026
2026_MoRTH_905009_1 · Engineering services: Recorded Deadline Passed · recorded closing 30/9/2026, 11:00:00 am IST · checked 30 September 2026
2026_MoRTH_904999_1 · Engineering services: Recorded Deadline Passed · recorded closing 30/9/2026, 11:00:00 am IST · checked 30 September 2026
2026_MoRTH_904991_1 · Engineering services: Recorded Deadline Passed · recorded closing 30/9/2026, 11:00:00 am IST · checked 30 September 2026
The NH-913 implementation map spans Huri–Taliha, Bile–Migging, Lada–Sarli and Bomdila–Nafra–Lada sections. A historical ₹2,248.94-crore approval identifies a defined Lada–Sarli subset; current engineering appointments provide a separate view of implementation responsibilities.
Implementation-support records · dated capital approval for specified Lada–Sarli works
MoRTH · Regional Office Itanagar and the respective implementing entities
Project & commercial implications →Tamil NaduCapital project
₹1,423.5crore
₹1,423.50 crore · whole-park project value disclosed in March 2023
184.27 acres · park linked to Kadambattur Railway Station
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityManufacturing, MSME & Industrial PolicyTrade, Customs & Strategic Supply ChainsNHLML · Institution named in source recordNHAI · Institution named in source recordChennai MMLP · Institution named in source recordThe Kadambattur connection belongs within the wider Chennai multimodal logistics park investment. The opportunity extends beyond track works to terminals, warehousing, equipment, cargo services and the commercial use of a connected logistics asset.
GujaratCapital project
₹873.62crore
₹873.62 crore · balance-works estimate, not an awarded amount
26.6 km · km 128.0–154.6 · eight-lane EPC balance works
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · PIU Surat · Authority named in project recordA 26.6-km, eight-lane EPC balance-works package. Assess remaining civil and systems scope, existing-asset interfaces and the actual purchasing route; this estimate is not the entire expressway investment.
MaharashtraCapital project
₹821.05crore
₹821.05 crore · historical notice estimate for the identified works scope
9.66 km · km 0.050–9.710 · HAM elevated corridor
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityHAMNHAI · Authority named in project recordFour-lane elevated infrastructure and approaches on the Old Pune Naka–Boramani Naka section. Assess HAM and construction interfaces, urban delivery conditions and package-specific purchasing; the estimate is separate from a final award.
Project estimates are identified by scope and source. Consultancy fees, programme funding and a company’s wider investment commitment are not ranked as individual project capex. Project visibility continues beyond preparation-procurement deadlines.