Bharat Pulse · Investment & implementation

Projects first.
Opportunity in perspective.

Explore the underlying assets, their investment scale and the route to participation. Project preparation, implementation and supplier opportunities sit within one connected view.

25 projects · Latest & Updated firstReset filters
MaharashtraCapital project

₹13,500crore

Pune Metro Phase II: approximately ₹13,500 crore across four expansion corridors

Approximately ₹13,500 crore · Phase-II announcement, 2 November 2026

Four corridors · approximately 44.4 km · 41 stations across the earlier approvals

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentManufacturing, MSME & Industrial Policy

The foundation-stone milestone on 3 November shifts attention to the delivery interfaces of lines 2A, 2B, 4 and 4A. The separately inaugurated Line 3 belongs to the operating-network story, not the fresh Phase-II procurement pipeline.

Approved Phase-II expansion · foundation stone laid on 3 November 2026

Maharashtra Metro Rail Corporation Limited

Project & commercial implications →
BiharCapital project

₹1,339crore

Gaya’s manufacturing cluster: connect investor entry with infrastructure already under execution

₹1,339 crore · approved 28 August 2024, including land cost

1,670 acres · Dobhi, Gaya · AKIC industrial cluster

Industry, model and participation detailsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentReal Estate, Housing & LandAgriculture, Food Processing & Rural Economy

The 1,670-acre IMC Gaya combines an approved ₹1,339-crore infrastructure project with a new investor-facilitation milestone. The October MoUs concern prospective manufacturing investment; they are separate from the cluster budget and from trunk-infrastructure contracts already appointed.

Trunk infrastructure under execution · new investor MoUs and allotment portal

Bihar Integrated Manufacturing City Gaya Limited — BIADA / NICDIT joint venture

Project & commercial implications →
OdishaCapital project

₹35,000crore

NLC Odisha: proposed 3,200-MW thermal power plant

₹35,000 crore · potential investment stated in the 22 October MoU announcement

4 × 800 MW · proposed ultra-supercritical coal-based plant

Industry, model and participation detailsPower, Energy & RenewablesMining, Metals & Critical MineralsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentNLC India Limited · Project proponentIndustrial Promotion and Investment Corporation of Odisha Limited · State investment-promotion counterpart

NLC India’s IPICOL agreements identify a proposed 3,200-MW thermal plant, a beach-sand processing facility and gasification-linked fertiliser exploration. Each has a different development basis; the announced investment intentions do not constitute one sanctioned project or an open EPC procurement.

MoU-stage proposal · project-specific decisions pending

NLC India Limited / IPICOL

Project & commercial implications →
OdishaCapital project

₹2,000crore

NLC Odisha: proposed beach-sand mineral-processing facility

₹2,000 crore · tentative investment stated in the 22 October MoU announcement

Mineral-processing facility · site and throughput not specified

Industry, model and participation detailsPower, Energy & RenewablesMining, Metals & Critical MineralsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentNLC India Limited · Project proponentIndustrial Promotion and Investment Corporation of Odisha Limited · State investment-promotion counterpart

NLC India’s IPICOL agreements identify a proposed 3,200-MW thermal plant, a beach-sand processing facility and gasification-linked fertiliser exploration. Each has a different development basis; the announced investment intentions do not constitute one sanctioned project or an open EPC procurement.

MoU-stage proposal · project-specific decisions pending

NLC India Limited / IPICOL

Project & commercial implications →
MaharashtraCapital project

₹922.67crore

Mumbai’s Victoria Dock marina: a 45-year waterfront concession with a defined marine–landside split

₹922.67 crore · official estimated project cost

37.3-hectare protected water area · 424 Phase-I berths · 604 at full build-out

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentFinancial Services, Capital Markets & InsuranceDBFOTPPP

Mumbai Port Authority’s ₹922.67-crore project combines a protected marina with hospitality, yacht services and waterfront activity. The concessionaire’s investment case must distinguish the marine works already commenced by the Port from landside development, later berth expansion and long-term operations.

Global concession bidding announced · 45-year DBFOT

Mumbai Port Authority

Project & commercial implications →
Ladakh · Himachal PradeshCapital project

₹2,500crore

Nimmu–Padum–Darcha: 298-km inaugurated road corridor

₹2,500 crore · reported cost of the inaugurated road

298 km · completed road connectivity

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityBorder Roads Organisation · Road implementing organisation

The completed BRO corridor provides a defined connectivity asset. Its reported cost is distinct from a new works procurement; operating-service opportunities require their own purchaser and contract.

Inaugurated 15 October · subsequent operating procurement separate

Border Roads Organisation

Project & commercial implications →
Tamil NaduCapital project

₹4,900crore

Chennai Metro Poonamallee–Vadapalani: inaugurated Phase-II stretch

Approximately ₹4,900 crore · reported cost of the inaugurated stretch

Poonamallee–Vadapalani · Phase-II stretch

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentOil, Gas & PetrochemicalsManufacturing, MSME & Industrial PolicyChennai Metro Rail Limited · Metro asset organisation

An operating and lifecycle opportunity within the Chennai Metro network. The stated cost describes the completed stretch, not an open construction or design package.

Inaugurated stretch · operating and lifecycle context

Chennai Metro Rail Limited

Project & commercial implications →
Tamil NaduCapital project

₹1,620crore

CPCL Manali: ₹1,620-crore base-oils project links refinery investment with premium-lubricant manufacturing

Approximately ₹1,620 crore · announced whole-project cost

270,000 tonnes/year · Group II/III Lube Oil Base Stocks

Industry, model and participation detailsOil, Gas & PetrochemicalsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentTrade, Customs & Strategic Supply ChainsChennai Petroleum Corporation Limited · Project owner at Manali refinery

The 270,000-tonne-per-year Group II/III Lube Oil Base Stocks project is a defined industrial investment within the October Tamil Nadu programme. Its commercial chain runs from project execution and refinery integration to product acceptance and lubricant-market customers.

Foundation-stage project · implementation and procurement tracked separately

Chennai Petroleum Corporation Limited

Project & commercial implications →
RajasthanCapital project

₹13,037.66crore

Jaipur Metro Phase II: ₹13,037.66-crore investment progresses through systems preparation

₹13,037.66 crore · whole Phase-II cost approved on 8 April 2026

41 km · 36 stations · Prahladpura–Todi Mod

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentPower, Energy & RenewablesManufacturing, MSME & Industrial PolicyRajasthan Metro Rail Corporation Limited · Implementing joint ventureDelhi Metro Rail Corporation · Issuing authority for JEDD-01 design procurement

2026_DMRC_929158_1 · Supporting engineering services: Recorded Deadline Passed · recorded closing 2/11/2026, 3:00:00 pm IST · checked 11 October 2026

The approved 41-km Prahladpura–Todi Mod corridor comprises 36 stations. Its electrical-design milestone belongs within a much wider rail, civil, power, equipment and operating ecosystem.

Approved metro project · electrical preparation milestone

Rajasthan Metro Rail Corporation Limited; DMRC for the identified design procurement

Project & commercial implications →
DelhiCapital project

₹1,789.52crore

Delhi ITMS: ₹1,789.52 crore approved for 42 traffic corridors

₹1,789.52 crore · approved project estimate

42 corridors · 1,092 signal and 1,029 enforcement locations

Industry, model and participation detailsAI, Cybersecurity & Data GovernanceTransport, Logistics & MobilityDigital, Telecom & ElectronicsEquipment SupplyTechnology PartnershipO&M/ServicesDelhi Police · Implementing authority

Adaptive traffic control, enforcement and command infrastructure form a phased technology implementation programme.

ChhattisgarhCapital project

₹5,427crore

NMDC’s ₹5,427-crore Bastar chain: commissioning shifts the opportunity towards operations and value addition

₹5,427 crore · integrated commissioned asset chain, not new tender value

2-MTPA pellet plant · 15-MTPA, 135-km slurry pipeline · processing facilities

Industry, model and participation detailsMining, Metals & Critical MineralsManufacturing, MSME & Industrial PolicyTransport, Logistics & MobilityInfrastructure & Urban DevelopmentNMDC · Institution named in source recordMinistry of Steel · Institution named in source record

The Bacheli processing facilities, 135-km slurry pipeline and Nagarnar pellet plant form an integrated mining-to-steel feedstock system. Commissioning makes operating performance, industrial services and downstream customer relationships the relevant commercial focus.

Commissioning milestone · operating and downstream ecosystem

NMDC and the relevant operating or contracting entities

Project & commercial implications →
Gujarat · AssamCapital project

₹2,300crore

Kandla’s ₹2,300-crore e-methanol project: the green-fuel value chain takes shape

₹2,300 crore · total announced project investment

150 tonnes per day · two phases

Industry, model and participation detailsOil, Gas & PetrochemicalsPower, Energy & RenewablesTransport, Logistics & MobilityEnvironment & ClimateInfrastructure & Urban DevelopmentDeendayal Port Authority · Institution named in source recordDPA · Institution named in source recordAssam Petro-Chemicals Limited · Institution named in source recordAPCL · Institution named in source recordMoPSW · Institution named in source record

The 150-tonne-per-day DPA–APCL project has reached foundation stage. Its commercial significance extends from production equipment to renewable inputs, storage, marine-fuel logistics and customer acceptance.

Foundation stage · phased project implementation

Deendayal Port Authority and Assam Petro-Chemicals Limited

Project & commercial implications →
AssamCapital project

₹48,000crore

Chapar’s ₹48,000-crore power project: where qualified suppliers can enter

₹48,000 crore · announced project investment

3,200 MW · 4 × 800 MW

Industry, model and participation detailsPower, Energy & RenewablesInfrastructure & Urban DevelopmentManufacturing, MSME & Industrial PolicyTransport, Logistics & MobilityAdani Power · Institution named in source recordAssam Power Distribution Company Limited · Institution named in source recordAPDCL · Institution named in source record

Adani Power’s 3,200-MW Chapar project creates a client-side ecosystem for engineering, equipment, logistics and industrial services. The commercial task is to identify the purchasing entity, work package and qualification route—not treat the project announcement as a fresh EPC tender.

Foundation laid · client-side supplier and contractor ecosystem

Adani Power

Project & commercial implications →
IndiaCapital project

₹25,015.89crore

Bharat Coal Gasification & Chemicals: ammonium-nitrate project

₹25,015.89 crore · project estimate

0.66 MMTPA · ammonium nitrate

Industry, model and participation detailsMining, Metals & Critical MineralsPower, Energy & RenewablesOil, Gas & PetrochemicalsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentBharat Coal Gasification & Chemicals Ltd. · Authority named in project record

A separately identified capital project within CIL’s coal-to-chemicals portfolio. Assess process integration, utilities, commercial partnerships and package-level procurement through the project entity.

Project development · individual project estimate

Bharat Coal Gasification & Chemicals Ltd.

Project & commercial implications →
IndiaCapital project

₹12,214.86crore

CIL–BPCL Chandrapur: coal-to-SNG project

₹12,214.86 crore · project estimate

633.6 million Nm³/year · SNG

Industry, model and participation detailsMining, Metals & Critical MineralsPower, Energy & RenewablesOil, Gas & PetrochemicalsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentCIL / BPCL · Authority named in project record

A separately identified capital project within CIL’s coal-to-chemicals portfolio. Assess process integration, utilities, commercial partnerships and package-level procurement through the project entity.

Project development · individual project estimate

CIL / BPCL

Project & commercial implications →
IndiaCapital project

₹13,052.81crore

Coal Gas India: synthetic-natural-gas project

₹13,052.81 crore · project estimate

633.6 million Nm³/year · SNG

Industry, model and participation detailsMining, Metals & Critical MineralsPower, Energy & RenewablesOil, Gas & PetrochemicalsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentCoal Gas India Ltd. · Authority named in project record

A separately identified capital project within CIL’s coal-to-chemicals portfolio. Assess process integration, utilities, commercial partnerships and package-level procurement through the project entity.

Project development · individual project estimate

Coal Gas India Ltd.

Project & commercial implications →
IndiaCapital project

₹19,062.22crore

Talcher Fertilizers: coal-to-urea project

₹19,062.22 crore · project estimate

1.27 MMTPA · urea

Industry, model and participation detailsMining, Metals & Critical MineralsPower, Energy & RenewablesOil, Gas & PetrochemicalsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentTalcher Fertilizers Ltd. · Authority named in project record

A separately identified capital project within CIL’s coal-to-chemicals portfolio. Assess process integration, utilities, commercial partnerships and package-level procurement through the project entity.

Project development · individual project estimate

Talcher Fertilizers Ltd.

Project & commercial implications →
MaharashtraCapital project

₹9,030.38crore

Ahilyanagar–Hasapur: ₹9,030.38 crore highway package

₹9,030.38 crore · notice value

Concession / highway development; final RFP governs

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · Authority named in project record

NHAI notice 2026_NHAI_277031_1 covers a six-lane access-controlled greenfield highway from Ahilyanagar to Hasapur, kilometre 290 to 512, in Maharashtra. The published tender value is ₹9,030.38 crore.

Recorded works-bid window elapsed · project tracking continues

NHAI

Project & commercial implications →
TelanganaCapital project

₹3,727.32crore

Hyderabad northern expressway: ₹3,727.32 crore HAM package

₹3,727.32 crore · notice value

HAM

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · Authority named in project record

Package II runs from Pragnapur at kilometre 82 to Tangad Palle at kilometre 160 under the Hybrid Annuity Model. NHAI records a tender value of ₹3,727.32 crore.

Recorded works-bid window elapsed · project tracking continues

NHAI

Project & commercial implications →
MaharashtraCapital project

₹3,653.09crore

Pagote–Chowk: ₹3,653.09 crore BOT (Toll) notice

₹3,653.09 crore · notice value

BOT (Toll)

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityBOT–TollNHAI · Authority named in project record

The successor NHAI tender 2025_NHAI_244402_1 concerns a 29.219 kilometre six-lane Pagote–Chowk highway in Maharashtra under BOT (Toll), with a recorded value of ₹3,653.09 crore.

Recorded works-bid window elapsed · project tracking continues

NHAI

Project & commercial implications →
Varanasi, Uttar PradeshCapital project

₹10,998.32crore

Varanasi Varuna corridor: ₹10,998.32 crore HAM project watch

₹10,998.32 crore · announced project

HAM · as described in government announcement

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityGovernment of India / Road infrastructure authorities · Authority named in project record

The government’s New India Samachar issue for 1–15 August 2026 describes a six/four-lane elevated Varuna corridor with ramps and loops, connecting the NH-31 side to Kashi railway station.

Project development / announced programme

Government of India / Road infrastructure authorities

Project & commercial implications →
Arunachal PradeshCapital project

₹2,248.94crore

Frontier Highway: the ₹2,248.94-crore Lada–Sarli approval within a wider implementation pipeline

₹2,248.94 crore · Lada–Sarli packages 1, 2, 3 and 6 approved in February 2024; not the whole corridor

105.59 km sanctioned Lada–Sarli subset · wider NH-913 section tracking

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Institution named in source recordRegional Office Itanagar · Institution named in source record

2026_MoRTH_905015_1 · Engineering services: Recorded Deadline Passed · recorded closing 30/9/2026, 11:00:00 am IST · checked 30 September 2026

2026_MoRTH_905009_1 · Engineering services: Recorded Deadline Passed · recorded closing 30/9/2026, 11:00:00 am IST · checked 30 September 2026

2026_MoRTH_904999_1 · Engineering services: Recorded Deadline Passed · recorded closing 30/9/2026, 11:00:00 am IST · checked 30 September 2026

2026_MoRTH_904991_1 · Engineering services: Recorded Deadline Passed · recorded closing 30/9/2026, 11:00:00 am IST · checked 30 September 2026

The NH-913 implementation map spans Huri–Taliha, Bile–Migging, Lada–Sarli and Bomdila–Nafra–Lada sections. A historical ₹2,248.94-crore approval identifies a defined Lada–Sarli subset; current engineering appointments provide a separate view of implementation responsibilities.

Implementation-support records · dated capital approval for specified Lada–Sarli works

MoRTH · Regional Office Itanagar and the respective implementing entities

Project & commercial implications →
Tamil NaduCapital project

₹1,423.5crore

Chennai’s ₹1,423.50-crore logistics park: rail connectivity is the commercial multiplier

₹1,423.50 crore · whole-park project value disclosed in March 2023

184.27 acres · park linked to Kadambattur Railway Station

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityManufacturing, MSME & Industrial PolicyTrade, Customs & Strategic Supply ChainsNHLML · Institution named in source recordNHAI · Institution named in source recordChennai MMLP · Institution named in source record

The Kadambattur connection belongs within the wider Chennai multimodal logistics park investment. The opportunity extends beyond track works to terminals, warehousing, equipment, cargo services and the commercial use of a connected logistics asset.

Awarded park development · rail-connectivity implementation support

NHLML and the Chennai MMLP implementing entities

Project & commercial implications →
GujaratCapital project

₹873.62crore

Vadodara–Mumbai Package IX: ₹873.62-crore Karvad–Jujuwa balance works

₹873.62 crore · balance-works estimate, not an awarded amount

26.6 km · km 128.0–154.6 · eight-lane EPC balance works

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · PIU Surat · Authority named in project record

A 26.6-km, eight-lane EPC balance-works package. Assess remaining civil and systems scope, existing-asset interfaces and the actual purchasing route; this estimate is not the entire expressway investment.

Recorded balance-works estimate · implementation and contractor tracking

NHAI · PIU Surat

Project & commercial implications →
MaharashtraCapital project

₹821.05crore

Solapur elevated corridor: ₹821.05-crore recorded works estimate

₹821.05 crore · historical notice estimate for the identified works scope

9.66 km · km 0.050–9.710 · HAM elevated corridor

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityHAMNHAI · Authority named in project record

Four-lane elevated infrastructure and approaches on the Old Pune Naka–Boramani Naka section. Assess HAM and construction interfaces, urban delivery conditions and package-specific purchasing; the estimate is separate from a final award.

Recorded works estimate · independent implementation milestones

NHAI

Project & commercial implications →

Project estimates are identified by scope and source. Consultancy fees, programme funding and a company’s wider investment commitment are not ranked as individual project capex. Project visibility continues beyond preparation-procurement deadlines.

Financial approvals: Managing Director only. No cash or personal-account payments for TLGS engagements. Verify & pay safely →