Bharat Pulse · Investment & implementation

Projects first.
Opportunity in perspective.

Explore the underlying assets, their investment scale and the route to participation. Project preparation, implementation and supplier opportunities sit within one connected view.

77 projects · Latest & Updated firstReset filters
KarnatakaDevelopment pipeline

Approximately 8 km · four-lane bypass

Athani town bypass on NH-548B

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentMoRTH Regional Office Bangalore · Issuing authority for the preparation notice

Three preparation notices identify separate four-laning and bypass assets. Their engineering studies are milestones within the underlying road-development pipeline; each corridor needs its own investment, approvals and implementation assessment.

Project preparation · separately scoped road asset

MoRTH Regional Office Bangalore

Project & commercial implications →
Tamil NaduDevelopment pipeline

Ennore–Mahabalipuram · canal rejuvenation and possible water-metro transport

Buckingham Canal: Chennai examines water-metro transport alongside rejuvenation

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentEnvironment & Climate

2026_CMRL_924016_1 · Supporting professional services: Submission not started · recorded closing 30/11/2026, 3:00:00 pm IST · checked 4 November 2026

The Ennore–Mahabalipuram study combines canal rejuvenation with assessment of a possible water-metro mode. Its business relevance lies in integrated waterway, transport and environmental project development, rather than a sanctioned ferry-construction programme.

Feasibility and project preparation · supporting submissions start 24 November

Chennai Metro Rail Limited

Project & commercial implications →
KarnatakaDevelopment pipeline

41.43 km · four-lane bypass development

Kalaburagi bypass chain: NH-150E to NH-50 via NH-150

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentMoRTH Regional Office Bangalore · Issuing authority for the preparation notice

Three preparation notices identify separate four-laning and bypass assets. Their engineering studies are milestones within the underlying road-development pipeline; each corridor needs its own investment, approvals and implementation assessment.

Project preparation · separately scoped road asset

MoRTH Regional Office Bangalore

Project & commercial implications →
KarnatakaDevelopment pipeline

Approximately 64 km · km 9.00–72.92 · four-laning

NH-150E: Kalaburagi–Chowdapur–Afzalpur–Ballurgi development

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentMoRTH Regional Office Bangalore · Issuing authority for the preparation notice

Three preparation notices identify separate four-laning and bypass assets. Their engineering studies are milestones within the underlying road-development pipeline; each corridor needs its own investment, approvals and implementation assessment.

Project preparation · separately scoped road asset

MoRTH Regional Office Bangalore

Project & commercial implications →
GujaratDevelopment pipeline

119.5 km · two lanes with paved shoulders · design km 0.000–119.500

Porbandar–Kalavad NH-151K: 119.5 km of corridor development

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban Development

The identified road asset extends from design km 0.000 to 119.500 and is to be upgraded to two lanes with paved shoulders. Its Independent Engineer selection is a supporting delivery milestone, not the value or scope of the main works.

Corridor development · supporting Independent Engineer selection

MoRTH Regional Office Gandhinagar

Project & commercial implications →
MaharashtraCapital project

₹13,500crore

Pune Metro Phase II: approximately ₹13,500 crore across four expansion corridors

Approximately ₹13,500 crore · Phase-II announcement, 2 November 2026

Four corridors · approximately 44.4 km · 41 stations across the earlier approvals

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentManufacturing, MSME & Industrial Policy

The foundation-stone milestone on 3 November shifts attention to the delivery interfaces of lines 2A, 2B, 4 and 4A. The separately inaugurated Line 3 belongs to the operating-network story, not the fresh Phase-II procurement pipeline.

Approved Phase-II expansion · foundation stone laid on 3 November 2026

Maharashtra Metro Rail Corporation Limited

Project & commercial implications →
MaharashtraDevelopment pipeline

Approximately 150 acres · rail-linked warehousing, cold storage and dry-port development

Sindi Railway logistics park: a 150-acre platform for rail-linked industrial logistics

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentManufacturing, MSME & Industrial Policy

The Wardha-area development combines warehousing, cold-chain and dry-port functions with rail connectivity. The next commercial task is to distinguish park development, logistics services and industrial-user entry from the already identified development arrangement.

Development milestone · bhoomipujan held on 1 November

NHLML / JNPA; AMARA TRANZ Solution identified in the development

Project & commercial implications →
Maharashtra · Gujarat · Dadra & Nagar HaveliDevelopment pipeline

508 km · twelve planned stations · Mumbai–Ahmedabad corridor

Mumbai–Ahmedabad high-speed rail: two distinct routes to operational readiness

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentDigital, Telecom & Electronics

2026_NHSRC_295569_1 · Operations consultancy · qualification under the actual tender: Submission not started · recorded closing 7/12/2026, 3:00:00 pm IST · checked 26 October 2026

2026_NHSRC_295369_1 · Operational readiness and transition · EOI / qualification selection: Submission not started · recorded closing 18/1/2027, 3:00:00 pm IST · checked 26 October 2026

The 508-km corridor now has separately identified operations-consultancy and readiness-and-transition selection records. Their differing scopes, qualification routes and future submission windows matter to rail operators, specialist advisers and delivery partners preparing for a complex operational handover.

Operational-preparation selections · submissions begin in November and January

National High Speed Rail Corporation Limited

Project & commercial implications →
BiharDevelopment pipeline

Mobile Quality Control Van · supply, operation and maintenance

Bihar: mobile quality-control and highway testing service

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentDigital, Telecom & Electronics

MoRTH’s separate second-call procurements cover supply, operation and maintenance of Mobile Quality Control Vans for non-destructive testing of National Highway works. The opportunities concern a defined testing service and equipment lifecycle, not the construction value of every road tested.

Two technical-services procurements · separate state scopes

MoRTH / MoRTH Special Project Zone Delhi

Project & commercial implications →
GoaDevelopment pipeline

Existing bridge · sensors, data acquisition and reporting

Borim Bridge NH-566: continuous structural monitoring

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentDigital, Telecom & Electronics

2026_MoRTH_929604_1 · Borim bridge monitoring · qualified technical participation: Dated participation record · recorded closing 23/11/2026, 11:00:00 am IST · checked 26 October 2026

Two Goa contracts address sensors, data acquisition, transmission and reporting for existing bridges. Their value lies in a dependable structural-monitoring service and an actionable engineering record—not new bridge construction or an assumption that sensor installation alone certifies structural safety.

Monitoring-system procurement · submission scheduled from 16 November

MoRTH / Goa PWD

Project & commercial implications →
GoaDevelopment pipeline

Existing bridge · sensors, data acquisition and reporting

Old Zuari Bridge NH-66: continuous structural monitoring

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentDigital, Telecom & Electronics

2026_MoRTH_929628_1 · Old Zuari bridge monitoring · qualified technical participation: Dated participation record · recorded closing 23/11/2026, 11:00:00 am IST · checked 26 October 2026

Two Goa contracts address sensors, data acquisition, transmission and reporting for existing bridges. Their value lies in a dependable structural-monitoring service and an actionable engineering record—not new bridge construction or an assumption that sensor installation alone certifies structural safety.

Monitoring-system procurement · submission scheduled from 16 November

MoRTH / Goa PWD

Project & commercial implications →
AssamDevelopment pipeline

Kamakhya Railway Station–Kamakhya Temple connection · DBFOT

Kamakhya station–temple ropeway: a concession linking construction with long-term passenger operations

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentDBFOT

The proposed connection between Kamakhya Railway Station and Kamakhya Temple is being procured on DBFOT terms. Investor assessment should connect the transport function, land and access interfaces, technology partnership and lifecycle obligations rather than treat the notice as a stand-alone engineering appointment.

DBFOT concession procurement recorded

National Highways Logistics Management Limited / NHAI

Project & commercial implications →
MaharashtraCapital project

₹922.67crore

Mumbai’s Victoria Dock marina: a 45-year waterfront concession with a defined marine–landside split

₹922.67 crore · official estimated project cost

37.3-hectare protected water area · 424 Phase-I berths · 604 at full build-out

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentFinancial Services, Capital Markets & InsuranceDBFOTPPP

Mumbai Port Authority’s ₹922.67-crore project combines a protected marina with hospitality, yacht services and waterfront activity. The concessionaire’s investment case must distinguish the marine works already commenced by the Port from landside development, later berth expansion and long-term operations.

Global concession bidding announced · 45-year DBFOT

Mumbai Port Authority

Project & commercial implications →
JharkhandDevelopment pipeline

NH-133 · Mirza Chauki–Mahagama corridor

NH-133 Mirza Chauki–Mahagama: the development corridor behind the feasibility and design milestone

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban Development

NHAI’s new preparation record concerns the NH-133 section between Mirza Chauki, identified in the notice as earlier Ekchari, and Mahagama. The commercial pipeline begins with defining the corridor and preconstruction requirements; the design appointment is not a main-works award.

Feasibility and detailed-project preparation

National Highways Authority of India

Project & commercial implications →
RajasthanDevelopment pipeline

NH-921 km 0.850–50.246 · 49.396 km four-laning; NH-21 km 0.000–1.700 flyover

NH-921 Mahwa–Mandawar–Rajgarh: four-laning paired with the NH-21 junction flyover

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentEPC

The procurement combines 49.396 km of four-laning with paved shoulders on NH-921 and a separate 1.700-km flyover scope on NH-21. Contractors and finance partners should evaluate the combined package’s road, structural and junction interfaces rather than a professional-services opportunity.

Main-works procurement recorded · EPC delivery

MoRTH · Bharatmala and Special Projects Cell

Project & commercial implications →
RajasthanDevelopment pipeline

Six-lane access-controlled Rasisar–Deogarh · NH-754K / new NH-754A

Rasisar–Deogarh highway: operating-asset supervision within the Amritsar–Jamnagar corridor

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban Development

The six-lane access-controlled section is entering a fresh supervision procurement during operation and maintenance. The relevant industry proposition is asset performance, inspection evidence and contractual management—not a newly available award to build the entire Amritsar–Jamnagar corridor.

Operating corridor · supporting O&M supervision procurement

NHAI Regional Office Jaipur

Project & commercial implications →
Uttar PradeshDevelopment pipeline

Mobile Quality Control Van · supply, operation and maintenance

Uttar Pradesh: mobile quality-control and highway testing service

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentDigital, Telecom & Electronics

MoRTH’s separate second-call procurements cover supply, operation and maintenance of Mobile Quality Control Vans for non-destructive testing of National Highway works. The opportunities concern a defined testing service and equipment lifecycle, not the construction value of every road tested.

Two technical-services procurements · separate state scopes

MoRTH / MoRTH Special Project Zone Delhi

Project & commercial implications →
KeralaDevelopment pipeline

Deep-sea fishery training fleet · modernisation preparation

CIFNET fleet modernisation: preparation scope and the single-tender route

Industry, model and participation detailsTransport, Logistics & MobilityEducation & SkillsAgriculture, Food Processing & Rural Economy

2026_DAHDF_854330_2 · Single-tender consultancy · participation restricted to the actual invitation: Recorded Deadline Passed · recorded closing 29/10/2026, 4:00:00 pm IST · checked 20 October 2026

Modernisation of the deep-sea fishery training fleet requires a defined operating and investment case before implementation. The current DPR notice is officially classified as a single tender; public visibility is not an unrestricted invitation to consulting firms.

Single tender · participation under the invitation; submission recorded for 29 October

Director, CIFNET, Kochi

Project & commercial implications →
UttarakhandDevelopment pipeline

86 km · two lanes with paved shoulders · Gangotri–Heena

Gangotri–Heena: an 86-km hill-road upgrade reaches a revised preparation milestone

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityEnvironment & Climate

2026_MoRTH_922363_1 · Supporting professional services · qualification under the actual RFP: Recorded Deadline Passed · recorded closing 2/11/2026, 5:00:00 pm IST · checked 20 October 2026

Rehabilitation and widening of the NH-34 corridor from Gangotri to Heena remain the underlying project. A fresh DPR submission extension advances the preparation record without establishing a construction award, approved capital budget or completed design.

DPR Corrigendum II · submission extended to 2 November

MoRTH Regional Office Dehradun / NH Uttarakhand PWD

Project & commercial implications →
West BengalDevelopment pipeline

150-capacity women’s hostel · main gate · assembly-hall improvements

IMU Kolkata: student accommodation and campus improvements enter design preparation

Industry, model and participation detailsInfrastructure & Urban DevelopmentEducation & SkillsTransport, Logistics & Mobility

2026_BandR_930155_1 · Supporting professional services: Recorded Deadline Passed · recorded closing 4/11/2026, 5:30:00 pm IST · checked 20 October 2026

A 150-capacity women’s hostel, a new main gate and assembly-hall improvements form a defined maritime-education campus programme. Architecture and design procurement is the preparation milestone, with execution-stage support included.

Design preparation · supporting consultancy submission on 4 November

Indian Maritime University; Bridge & Roof as tendering organisation

Project & commercial implications →
RajasthanDevelopment pipeline

Proposed Kota–Rawatbhata spur · Rajasthan

Kota–Rawatbhata spur: building the evidence for a highway-development decision

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & Mobility

2026_MoRTH_930727_1 · Supporting professional services · qualification under the actual RFP: Dated participation record · recorded closing 30/11/2026, 11:00:00 am IST · checked 20 October 2026

MoRTH's preparation programme for the proposed Rajasthan spur creates a road-planning and engineering opportunity. The commercial task is to connect the commissioned studies to route, demand, approvals and delivery decisions before assuming a construction package or capital value.

DPR selection · submission recorded for 30 November

MoRTH Regional Office Jaipur

Project & commercial implications →
LadakhDevelopment pipeline

23,800 sq m · 35-lakh annual passenger design capacity

Leh Airport: inaugurated passenger-terminal capacity

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & Mobility

A completed terminal with a design capacity of 35 lakh passengers annually. Assess actual airport operating arrangements and demand; no concession or currently open services package is implied.

Inaugurated 15 October · subsequent operating procurement separate

Airports Authority of India / Leh Airport

Project & commercial implications →
KarnatakaDevelopment pipeline

136.7 km · km 264.00–400.70 · proposed four lanes with paved shoulders

NH-52 Anchatageri–Baleguli Cross: 136.7 km moves into four-laning preparation

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & Mobility

2026_MoRTH_930446_1 · Supporting professional services · qualification under the actual RFP: Dated participation record · recorded closing 27/11/2026, 3:00:00 pm IST · checked 20 October 2026

The proposed upgrade from two to four lanes with paved shoulders creates a substantial highway-preparation assignment. Its consultancy estimate and submission calendar are distinct from the road's eventual investment approval and construction procurement.

DPR selection · submissions begin 6 November and close 27 November

MoRTH Regional Office Bengaluru

Project & commercial implications →
Ladakh · Himachal PradeshCapital project

₹2,500crore

Nimmu–Padum–Darcha: 298-km inaugurated road corridor

₹2,500 crore · reported cost of the inaugurated road

298 km · completed road connectivity

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityBorder Roads Organisation · Road implementing organisation

The completed BRO corridor provides a defined connectivity asset. Its reported cost is distinct from a new works procurement; operating-service opportunities require their own purchaser and contract.

Inaugurated 15 October · subsequent operating procurement separate

Border Roads Organisation

Project & commercial implications →
OdishaDevelopment pipeline

Concrete road overlay and side drains · defined internal-port stretch

Paradip Port: internal-road strengthening and drainage enter a supervision milestone

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban Development

2026_MoS_930027_1 · Supporting professional services: Recorded Deadline Passed · recorded closing 2/11/2026, 5:30:00 pm IST · checked 20 October 2026

Concrete overlay and side-drain improvements on a defined internal port-road stretch form the underlying infrastructure programme. The current notice concerns supporting project-management consultancy, not a newly established main-works capital value.

Supporting PMC selection · pre-bid 22 October; submission 2 November

Paradip Port Authority

Project & commercial implications →
UttarakhandDevelopment pipeline

358.50 m · km 97.327 · NH-34 rehabilitation

Tambakhani Tunnel: rehabilitation preparation advances under a revised selection timetable

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & Mobility

2026_MoRTH_922259_1 · Supporting professional services · qualification under the actual RFP: Recorded Deadline Passed · recorded closing 3/11/2026, 5:00:00 pm IST · checked 20 October 2026

The 358.50-m tunnel on NH-34 is the underlying rehabilitation asset. MoRTH's latest extension concerns its supporting DPR consultancy, creating a defined preparation-stage opportunity for qualified tunnel and structural-assessment teams.

DPR Corrigendum-4 · submission recorded for 3 November

MoRTH Regional Office Dehradun

Project & commercial implications →
Jammu and KashmirDevelopment pipeline

New integrated terminal · allied works · apron extension

Srinagar Airport expansion: the terminal and apron project behind the management milestone

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentAirports Authority of India · Airport project and identified procurement authority

2026_AAI_287844_1 · Supporting project-management services: Recorded Deadline Passed · recorded closing 23/10/2026, 6:00:00 pm IST · checked 18 October 2026

AAI’s planned integrated terminal, associated infrastructure and apron extension form the underlying development opportunity. Industry positioning should follow the airport’s implementation interfaces and actual works packages, with the management-services invitation retained as supporting context.

Project preparation · management-services date revised

Airports Authority of India

Project & commercial implications →
Tamil NaduCapital project

₹4,900crore

Chennai Metro Poonamallee–Vadapalani: inaugurated Phase-II stretch

Approximately ₹4,900 crore · reported cost of the inaugurated stretch

Poonamallee–Vadapalani · Phase-II stretch

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentOil, Gas & PetrochemicalsManufacturing, MSME & Industrial PolicyChennai Metro Rail Limited · Metro asset organisation

An operating and lifecycle opportunity within the Chennai Metro network. The stated cost describes the completed stretch, not an open construction or design package.

Inaugurated stretch · operating and lifecycle context

Chennai Metro Rail Limited

Project & commercial implications →
Tamil NaduDevelopment pipeline

Capital dredging · Container Terminal Phase-I, Stage-II

Kamarajar Port: capital dredging for Container Terminal Phase-I, Stage-II

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentOil, Gas & PetrochemicalsManufacturing, MSME & Industrial PolicyKamarajar Port Limited · Port project owner

The foundation milestone identifies a marine infrastructure workstream distinct from the inaugurated Coal Berth-3. Verify the actual project and contract record before approaching implementation or supply roles.

Foundation milestone · procurement tracked separately

Kamarajar Port Limited

Project & commercial implications →
Tamil NaduDevelopment pipeline

Four-lane bypass · NH-83

NH-83 Thiruvarur: four-lane bypass foundation milestone

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentMoRTH · Sector ministry; project procurement identified separately

The bypass belongs to the Nagapattinam–Thanjavur corridor. Its individual design, value, land and purchasing record must remain separate from the wider highway programme.

Foundation milestone · project-specific implementation

MoRTH · national-highway programme

Project & commercial implications →
RajasthanCapital project

₹13,037.66crore

Jaipur Metro Phase II: ₹13,037.66-crore investment progresses through systems preparation

₹13,037.66 crore · whole Phase-II cost approved on 8 April 2026

41 km · 36 stations · Prahladpura–Todi Mod

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentPower, Energy & RenewablesManufacturing, MSME & Industrial PolicyRajasthan Metro Rail Corporation Limited · Implementing joint ventureDelhi Metro Rail Corporation · Issuing authority for JEDD-01 design procurement

2026_DMRC_929158_1 · Supporting engineering services: Recorded Deadline Passed · recorded closing 2/11/2026, 3:00:00 pm IST · checked 11 October 2026

The approved 41-km Prahladpura–Todi Mod corridor comprises 36 stations. Its electrical-design milestone belongs within a much wider rail, civil, power, equipment and operating ecosystem.

Approved metro project · electrical preparation milestone

Rajasthan Metro Rail Corporation Limited; DMRC for the identified design procurement

Project & commercial implications →
UttarakhandDevelopment pipeline

Two-lane bypass · earlier alignment and alternatives

Joshimath Bypass: alignment reassessment shapes the next infrastructure decision

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityEnvironment & ClimateMoRTH · Institution named in the cited developmentRegional Office Dehradun · Institution named in the cited development

2026_MoRTH_929283_1 · Supporting engineering services: Dated participation record · recorded closing 23/11/2026, 5:00:00 pm IST · checked 11 October 2026

A renewed two-lane bypass preparation exercise examines the earlier foreclosed alignment alongside alternatives. The asset opportunity depends on an adoptable route, geotechnical evidence and a deliverable construction strategy.

Project Preparation · alignment alternatives under assessment

MoRTH · Regional Office Dehradun

Project & commercial implications →
AssamDevelopment pipeline

106.78 km · proposed four-lane upgrade

NH-129 Numaligarh–Lahorijan: 106.78 km of four-laning enters project preparation

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Institution named in the cited developmentRegional Office Guwahati · Institution named in the cited development

2026_MoRTH_929297_1 · Supporting engineering services: Dated participation record · recorded closing 21/11/2026, 3:00:00 pm IST · checked 11 October 2026

The Assam corridor links Numaligarh with Lahorijan near the Nagaland border. Industry should assess the future road, structures, utilities and construction supply chain as the alignment and investment scope are developed.

Project Preparation · four-laning studies invited

MoRTH · Regional Office Guwahati

Project & commercial implications →
MaharashtraDevelopment pipeline

96.5-km stated span · existing four-lane corridor

NH-52 MP–Maharashtra border–Dhule: operating-road services

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityDBFOTO&M/ServicesNHAI · Authority for the identified preparation or engineering record

Two operating four-lane highway assets have fresh engineering-support records. Their commercial relevance lies in maintenance, safety, rehabilitation and concession performance, with each corridor’s model and buyer kept separate.

Operational asset · O&M engineering milestone

NHAI

Project & commercial implications →
KarnatakaDevelopment pipeline

189.6-km stated span · existing four-lane corridor

NH-66 Goa–Karnataka border–Kundapur: highway lifecycle ecosystem

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityBOT–TollO&M/ServicesNHAI · Authority for the identified preparation or engineering record

Two operating four-lane highway assets have fresh engineering-support records. Their commercial relevance lies in maintenance, safety, rehabilitation and concession performance, with each corridor’s model and buyer kept separate.

Operational asset · O&M engineering milestone

NHAI

Project & commercial implications →
OdishaDevelopment pipeline

km 21–202 · specified bypass excluded

NH-26 Barpalli–Junagarh: four-laning excluding Bhawanipatna bypass

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Regional Office Bhubaneswar · Authority for the identified preparation or engineering record

NH-57 and the Barpalli–Junagarh section of NH-26 enter four-laning preparation, while NH-326/326A and separate southern NH-26 sections are being assessed for two lanes with paved shoulders.

Project preparation · future works scope

MoRTH · Regional Office Bhubaneswar

Project & commercial implications →
OdishaDevelopment pipeline

74.287 km combined · intervening 9 km excluded

Southern NH-26: two distinct paved-shoulder upgrade sections

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Regional Office Bhubaneswar · Authority for the identified preparation or engineering record

NH-57 and the Barpalli–Junagarh section of NH-26 enter four-laning preparation, while NH-326/326A and separate southern NH-26 sections are being assessed for two lanes with paved shoulders.

Project preparation · future works scope

MoRTH · Regional Office Bhubaneswar

Project & commercial implications →
OdishaDevelopment pipeline

131.500 km from stated chainages · two lanes with paved shoulders

NH-326/326A: Podamari–Mohana–Paralakhemundi upgrading

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Regional Office Bhubaneswar · Authority for the identified preparation or engineering record

NH-57 and the Barpalli–Junagarh section of NH-26 enter four-laning preparation, while NH-326/326A and separate southern NH-26 sections are being assessed for two lanes with paved shoulders.

Project preparation · future works scope

MoRTH · Regional Office Bhubaneswar

Project & commercial implications →
OdishaDevelopment pipeline

239.900 km · four-lane development

NH-57 Balangir–Nayagarh: 239.900-km four-laning preparation

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Regional Office Bhubaneswar · Authority for the identified preparation or engineering record

NH-57 and the Barpalli–Junagarh section of NH-26 enter four-laning preparation, while NH-326/326A and separate southern NH-26 sections are being assessed for two lanes with paved shoulders.

Project preparation · future works scope

MoRTH · Regional Office Bhubaneswar

Project & commercial implications →
Assam · BangladeshDevelopment pipeline

540-tonne inaugural shipment · Assam–Dhaka

Bogibeel–Bangladesh: first 540-tonne methanol voyage tests a cross-border freight corridor

Industry, model and participation detailsTransport, Logistics & MobilityTrade, Customs & Strategic Supply ChainsOil, Gas & PetrochemicalsIWAI · Inland-waterway infrastructure and facilitation institutionAssam Petro-Chemicals Limited · Methanol producer and cargo shipper

The shipment connects Assam production with Dhaka through NW-2 and the Indo-Bangladesh Protocol Route.

First commercial shipment dispatched

Inland Waterways Authority of India

Project & commercial implications →
MaharashtraDevelopment pipeline

Approximately 140 km · Dighi–Poladpur–Surur

Dighi Port–NH-48: 140-km greenfield corridor moves through project preparation

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentNHAI · Tendering authority for corridor feasibility and DPR

2026_NHAI_284464_1 · Corridor feasibility and DPR services: Recorded Deadline Passed · recorded closing 15/10/2026, 11:00:00 am IST · checked 11 October 2026

The proposed Maharashtra corridor links Dighi Port with NH-48; its current engineering-services window runs to 15 October 2026.

Project Preparation

National Highways Authority of India

Project & commercial implications →
Andhra PradeshDevelopment pipeline

FSS programme · 45,000-DWT-capable slipway

HSL shipbuilding: Surya launch and yard upgrades advance the fleet-support programme

Industry, model and participation detailsDefence, Aerospace & Homeland SecurityTransport, Logistics & MobilityInfrastructure & Urban DevelopmentHindustan Shipyard Limited · Shipbuilder and yard infrastructure ownerIndian Navy · Intended fleet-support vessel operator

The first Fleet Support Ship entered the water on 6 October; the fifth ship’s keel and upgraded lifting infrastructure mark separate execution milestones.

What changed? Added a separate yard-services and commercial-delivery matrix; the previously published 6 October milestones and project stage are unchanged.

Ship launch and yard infrastructure milestone

Hindustan Shipyard Limited

Project & commercial implications →
BiharDevelopment pipeline

3×800 MW expansion · integrated rail siding

Nabinagar Stage-II: rail logistics preparation for a 2,400-MW expansion

Industry, model and participation detailsPower, Energy & RenewablesTransport, Logistics & MobilityInfrastructure & Urban DevelopmentNTPC · Project and consultancy procurement authority

NTPC-CS-0371-350-9 · Railway DPR, detailed engineering and PMC: Recorded Deadline Passed · recorded closing 8/10/2026, 6:30:00 pm IST · checked 8 October 2026

NTPC’s railway-siding assignment integrates DPR, detailed engineering and project management with electrification and signalling.

Railway infrastructure preparation

NTPC Limited

Project & commercial implications →
KarnatakaDevelopment pipeline

Three facility scopes · Bengaluru and Mangaluru

NMPA-linked Karnataka facilities: interiors and administrative space enter design procurement

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityNBCC (India) Limited · Architectural and engineering consultancy tendering entityNMPA · Institution identified in the facilities programme reference

2026_NBCC_851677_2 · Architectural and engineering consultancy: Recorded Deadline Passed · recorded closing 10/10/2026, 3:00:00 pm IST · checked 8 October 2026

NBCC’s assignment covers the Trade Promotion Centre in Bengaluru, the BDC Building in Mangaluru and administrative-space revamping.

Architectural and engineering consultancy window

NBCC (India) Limited

Project & commercial implications →
MaharashtraDevelopment pipeline

Vadhvan Port · environmental and social advisory

Vadhvan Port: environmental and social advisory supports development readiness

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentEnvironment & ClimateVadhvan Port Project Limited · Port project entity and consultancy tendering authority

2026_VPPL_288465_1 · Environmental and social consultancy: Recorded Deadline Passed · recorded closing 23/10/2026, 3:00:00 pm IST · checked 8 October 2026

The specialist consultancy’s current submission deadline is 23 October, with opening recorded for 26 October.

Environmental and social consultancy window

Vadhvan Port Project Limited

Project & commercial implications →
KarnatakaDevelopment pipeline

Corridor-2 Package-1 · Corridor-4 ROB/RUB works

Bengaluru suburban rail: Corridor-2 and Corridor-4 structural design milestone

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentO&M/ServicesRail Infrastructure Development Company (Karnataka) Limited · Implementing authority

2026_KRIDE_286419_1 · Engineering services: Recorded Deadline Passed · recorded closing 14/10/2026, 3:00:00 pm IST · checked 18 October 2026

The asset remains the focus; the engineering invitation is a separately identified participation window.

Detailed-design procurement

Rail Infrastructure Development Company (Karnataka) Limited

Project & commercial implications →
RajasthanDevelopment pipeline

Proposed expressway corridor

Bikaner–Kotputli Expressway: corridor preparation returns to procurement

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentO&M/ServicesNational Highways Authority of India · Implementing authority

2026_NHAI_292987_1 · Engineering services: Recorded Deadline Passed · recorded closing 29/10/2026, 11:00:00 am IST · checked 26 October 2026

The asset remains the focus; the engineering invitation is a separately identified participation window.

What changed? Recorded the 21 October Corrigendum II extending the supporting DPR submission to 29 October and opening to 30 October. The underlying project scope, original event and publication dates, capital basis and material-update date are unchanged.

Project Preparation

National Highways Authority of India

Project & commercial implications →
DelhiCapital project

₹1,789.52crore

Delhi ITMS: ₹1,789.52 crore approved for 42 traffic corridors

₹1,789.52 crore · approved project estimate

42 corridors · 1,092 signal and 1,029 enforcement locations

Industry, model and participation detailsAI, Cybersecurity & Data GovernanceTransport, Logistics & MobilityDigital, Telecom & ElectronicsEquipment SupplyTechnology PartnershipO&M/ServicesDelhi Police · Implementing authority

Adaptive traffic control, enforcement and command infrastructure form a phased technology implementation programme.

West BengalDevelopment pipeline

Six-lane alignment · 7.5 km connection and 18.5 km corridor

Kolkata Port–NH16: six-lane tunnel connectivity enters project preparation

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentO&M/ServicesNational Highways Authority of India · Implementing authority

2026_NHAI_286566_1 · Engineering services: Recorded Deadline Passed · recorded closing 12/10/2026, 11:00:00 am IST · checked 4 October 2026

The asset remains the focus; the engineering invitation is a separately identified participation window.

Project Preparation

National Highways Authority of India

Project & commercial implications →
Madhya PradeshDevelopment pipeline

NH752B / NH347C and NH43 / NH543 / NH45

Madhya Pradesh highway preparation: two distinct DPR packages

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentO&M/ServicesMinistry of Road Transport and Highways · Procuring authority / Regional Office

2026_MoRTH_923662_1 · Engineering services: Recorded Deadline Passed · recorded closing 7/10/2026, 5:30:00 pm IST · checked 4 October 2026

2026_MoRTH_923598_1 · Engineering services: Recorded Deadline Passed · recorded closing 7/10/2026, 5:30:00 pm IST · checked 4 October 2026

Asset-specific engineering routes support corridor development and delivery decisions.

Project Preparation

Ministry of Road Transport and Highways

Project & commercial implications →
KarnatakaDevelopment pipeline

Six-lane NH48 corridors

NH48 Chitradurga–Davanagere–Haveri: an operating-road supervision opportunity

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentO&M/ServicesNational Highways Authority of India · Implementing authority

2026_NHAI_289532_1 · Engineering services: Recorded Deadline Passed · recorded closing 16/10/2026, 3:00:00 pm IST · checked 4 October 2026

The asset remains the focus; the engineering invitation is a separately identified participation window.

Operational corridors · O&M Independent Engineer invitation

National Highways Authority of India

Project & commercial implications →
UttarakhandDevelopment pipeline

311 km · two separate preparation packages

NH707A: Tyuni–Bataghat–Maletha corridor preparation

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentO&M/ServicesMinistry of Road Transport and Highways · Procuring authority / Regional Office

2026_MoRTH_914977_1 · Engineering services: Recorded Deadline Passed · recorded closing 18/11/2026, 5:00:00 pm IST · checked 4 November 2026

2026_MoRTH_914262_1 · Engineering services: Recorded Deadline Passed · recorded closing 5/10/2026, 5:00:00 pm IST · checked 4 October 2026

Asset-specific engineering routes support corridor development and delivery decisions.

What changed? Recorded the 19 October Corrigendum-7 extending only the Tyuni–Bataghat supporting consultancy to 3 November, with opening on 4 November. The separate Bataghat–Maletha notice, underlying asset, event date and publication freshness are unchanged.

Project Preparation

Ministry of Road Transport and Highways

Project & commercial implications →
Tamil NaduDevelopment pipeline

Four-lane access-controlled bypass · design km 135.796–158.506

Tiruvannamalai bypass: a defined supervision window

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentO&M/ServicesMinistry of Road Transport and Highways · Procuring authority / Regional Office

2026_MoRTH_924639_1 · Engineering services: Recorded Deadline Passed · recorded closing 27/10/2026, 3:00:00 pm IST · checked 4 October 2026

Asset-specific engineering routes support corridor development and delivery decisions.

Construction supervision procurement

Ministry of Road Transport and Highways

Project & commercial implications →
Odisha · Gujarat · India · United Arab EmiratesDevelopment pipeline

US$11.5 billion · stated joint investment intention for an integrated Odisha aluminium complex

India–UAE investment: the US$11.5-billion aluminium intention needs a project-level execution strategy

Industry, model and participation detailsTrade, Customs & Strategic Supply ChainsMining, Metals & Critical MineralsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityFinancial Services, Capital Markets & InsuranceIndia–UAE High Level Joint Task Force on Investments · Institution named in source recordMinistry of Commerce and Industry · Institution named in source record

The Joint Task Force review connects an Odisha aluminium investment intention with exploratory Dholera aviation and logistics discussions and financial cooperation. Industry should convert each track into a separate, commercially credible project proposition.

Investment intention and cooperation tracks · no prime award implied

Identified project sponsors through the India–UAE investment-cooperation framework

Project & commercial implications →
JharkhandDevelopment pipeline

128.098 km combined · two four-laning sections

Jharkhand’s NH-139/NH-22 four-laning: two corridors enter investment preparation

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · Institution named in source recordPIU Daltonganj · Institution named in source record

The Shildag–Parwa More and Jharkhand–Bihar border–Chandwa sections establish a highway-development pipeline of approximately 128.098 km. Industry positioning should focus on the future road assets, construction interfaces and delivery model as project preparation advances.

Four-laning preparation · feasibility and DPR procurement

NHAI · Project Implementation Unit, Daltonganj

Project & commercial implications →
Uttar Pradesh · Varanasi DivisionCapital project

₹223crore

Varanasi Division’s ₹223-crore Kavach approval: a defined rail-systems investment pipeline

₹223 crore · approved divisional deployment scope

614.75 route-km · Kavach Version 4.0

Industry, model and participation detailsTransport, Logistics & MobilityDigital, Telecom & ElectronicsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentMinistry of Railways · Institution named in source recordNorth Eastern Railway · Institution named in source recordVaranasi Division · Institution named in source record

The approved Kavach 4.0 scope covers 614.75 route-km of North Eastern Railway’s Varanasi Division. Qualified businesses should prepare for package-level procurement and integration responsibilities rather than treat approval as an immediately available equipment order.

Investment approved · package procurement to follow its own notices

Indian Railways · North Eastern Railway, Varanasi Division

Project & commercial implications →
AssamDevelopment pipeline

Second parallel tube · CH 138 · Assam

Nagabasti: second parallel tube for a twin-tube, four-lane tunnel configuration

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · Authority named in project record

The Assam project develops a second tube beside the existing tunnel. Candidate work follows the approved civil, approach, system and operating interfaces, not the value of its preparation consultancy.

Project preparation · existing-tunnel interface

NHAI

Project & commercial implications →
ChhattisgarhCapital project

₹5,427crore

NMDC’s ₹5,427-crore Bastar chain: commissioning shifts the opportunity towards operations and value addition

₹5,427 crore · integrated commissioned asset chain, not new tender value

2-MTPA pellet plant · 15-MTPA, 135-km slurry pipeline · processing facilities

Industry, model and participation detailsMining, Metals & Critical MineralsManufacturing, MSME & Industrial PolicyTransport, Logistics & MobilityInfrastructure & Urban DevelopmentNMDC · Institution named in source recordMinistry of Steel · Institution named in source record

The Bacheli processing facilities, 135-km slurry pipeline and Nagarnar pellet plant form an integrated mining-to-steel feedstock system. Commissioning makes operating performance, industrial services and downstream customer relationships the relevant commercial focus.

Commissioning milestone · operating and downstream ecosystem

NMDC and the relevant operating or contracting entities

Project & commercial implications →
Gujarat · AssamCapital project

₹2,300crore

Kandla’s ₹2,300-crore e-methanol project: the green-fuel value chain takes shape

₹2,300 crore · total announced project investment

150 tonnes per day · two phases

Industry, model and participation detailsOil, Gas & PetrochemicalsPower, Energy & RenewablesTransport, Logistics & MobilityEnvironment & ClimateInfrastructure & Urban DevelopmentDeendayal Port Authority · Institution named in source recordDPA · Institution named in source recordAssam Petro-Chemicals Limited · Institution named in source recordAPCL · Institution named in source recordMoPSW · Institution named in source record

The 150-tonne-per-day DPA–APCL project has reached foundation stage. Its commercial significance extends from production equipment to renewable inputs, storage, marine-fuel logistics and customer acceptance.

Foundation stage · phased project implementation

Deendayal Port Authority and Assam Petro-Chemicals Limited

Project & commercial implications →
Jammu & KashmirDevelopment pipeline

Four lanes with paved shoulders · Achhabal and Bijbehara spurs

NH-501 to Pahalgam: four-lane corridor and spur development moves into preparation

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Institution named in source recordRegional Office Chandigarh · Institution named in source record

The proposed upgrade from the NH-44/Alstop interface towards Pahalgam, with Achhabal and Bijbehara spurs, is an asset-development opportunity spanning highway works, structures, safety and connectivity interfaces.

What changed? Rechecked the existing NH-501 preparation notice: the previously recorded 26 October 15:00 IST closing date remains, with opening recorded for 27 October 15:30. This is not a deadline extension, construction award or new investment approval; original article text and project freshness are preserved.

Project preparation · DPR and pre-construction procurement

MoRTH · Regional Office Chandigarh

Project & commercial implications →
Northeast India · AssamDevelopment pipeline

RCC community jetties · five National Waterways

Northeast community jetties: five National Waterways enter infrastructure preparation

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentEnvironment & ClimateInland Waterways Authority of India · Institution named in source recordIWAI · Institution named in source recordRO Guwahati · Institution named in source record

2026_IWAI_927266_1 · Engineering services: Recorded Deadline Passed · recorded closing 13/10/2026, 3:00:00 pm IST · checked 28 September 2026

RCC community-jetty development across five National Waterways: civil infrastructure, landside access, utilities and future operating services.

Jetty infrastructure preparation · site-specific DPR stage

IWAI · Regional Office Guwahati

Project & commercial implications →
MaharashtraDevelopment pipeline

47.8 km · three adjoining sections

Ausa–Omerga: 47.8 km of NH-548B enters project preparation

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Institution named in source recordMaharashtra PWD · Institution named in source recordNational Highway Division Latur · Institution named in source record

Three adjoining sections establish a 47.8-km highway-development pipeline in Maharashtra. The commercial focus is the future road asset, its engineering and land interfaces, and eventual construction and supply packages.

Project preparation · three DPR packages issued

MoRTH / National Highway Division, Latur

Project & commercial implications →
GujaratDevelopment pipeline

61.658 km · two lanes with paved shoulders

Songarh–Ahwa: 61.658 km of NH-953 advances towards highway upgrading

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Institution named in source recordRegional Office Gandhinagar · Institution named in source record

The proposed two-lane-with-paved-shoulders upgrade connects the NH-53/Songarh junction to Ahwa. The project-development stage creates an early positioning window for construction, structures, drainage, safety and supporting services.

Project preparation · two-lane-with-paved-shoulders upgrade

MoRTH · Regional Office Gandhinagar

Project & commercial implications →
West BengalDevelopment pipeline

Gazole–Hili: 106.607 km · additional NH-517/NH-17 corridors

West Bengal highway development: Gazole–Hili and the NH-517/NH-17 corridors

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Institution named in source recordRegional Office Kolkata · Institution named in source record

2026_MoRTH_927429_1 · Engineering services: Recorded Deadline Passed · recorded closing 6/11/2026, 3:00:00 pm IST · checked 28 September 2026

2026_MoRTH_927436_1 · Engineering services: Recorded Deadline Passed · recorded closing 6/11/2026, 3:00:00 pm IST · checked 28 September 2026

The four-laning pipeline comprises the 106.607-km Gazole–Hili corridor and the Telipara–Jhumur/Birpara–Falakata network. DPR procurement marks project preparation; industry positioning should focus on the eventual road assets and implementation packages.

Four-laning preparation · two corridor studies commissioned through procurement

MoRTH · Regional Office Kolkata

Project & commercial implications →
AssamCapital project

₹48,000crore

Chapar’s ₹48,000-crore power project: where qualified suppliers can enter

₹48,000 crore · announced project investment

3,200 MW · 4 × 800 MW

Industry, model and participation detailsPower, Energy & RenewablesInfrastructure & Urban DevelopmentManufacturing, MSME & Industrial PolicyTransport, Logistics & MobilityAdani Power · Institution named in source recordAssam Power Distribution Company Limited · Institution named in source recordAPDCL · Institution named in source record

Adani Power’s 3,200-MW Chapar project creates a client-side ecosystem for engineering, equipment, logistics and industrial services. The commercial task is to identify the purchasing entity, work package and qualification route—not treat the project announcement as a fresh EPC tender.

Foundation laid · client-side supplier and contractor ecosystem

Adani Power

Project & commercial implications →
Jammu & Kashmir · Himachal Pradesh · Nagaland · TripuraDevelopment pipeline

J&K · Himachal Pradesh · Nagaland · Tripura

Hill-state ropeways: project preparation across four states and territories

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityEnvironment & ClimateNHLML / NHAI and the responsible state institutions · Authority named in project record

Jammu & Kashmir, Himachal Pradesh, Nagaland and Tripura form a site-based ropeway-development pipeline. Assess demand, terminal access, qualified technology partners, approvals and sustainable operations before investment.

Site and route preparation · separate project decisions

NHLML / NHAI and the responsible state institutions

Project & commercial implications →
GujaratDevelopment pipeline

Approximately 126 km · two distinct preparation scopes

Vadodara Outer Ring Road and NH-148M: a 126-km preparation pipeline

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · PIU Vadodara · Authority named in project record

Approximately 75 km of ring road and 51 km of Makarpura–Borsad development. Track alignment, land, structures, utilities and the subsequent investment and works-packaging decisions.

Project preparation · future implementation packaging

NHAI · PIU Vadodara

Project & commercial implications →
MaharashtraDevelopment pipeline

Final concession documents to verify

Adgaon–Ahilyanagar: greenfield highway opportunity watch

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · Authority named in project record

NHAI tender 2026_NHAI_277028_1 describes a six-lane access-controlled greenfield highway from Adgaon at kilometre 138 to Ahilyanagar at kilometre 290.

Recorded works-bid window elapsed · project tracking continues

NHAI

Project & commercial implications →
MaharashtraCapital project

₹9,030.38crore

Ahilyanagar–Hasapur: ₹9,030.38 crore highway package

₹9,030.38 crore · notice value

Concession / highway development; final RFP governs

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · Authority named in project record

NHAI notice 2026_NHAI_277031_1 covers a six-lane access-controlled greenfield highway from Ahilyanagar to Hasapur, kilometre 290 to 512, in Maharashtra. The published tender value is ₹9,030.38 crore.

Recorded works-bid window elapsed · project tracking continues

NHAI

Project & commercial implications →
TelanganaCapital project

₹3,727.32crore

Hyderabad northern expressway: ₹3,727.32 crore HAM package

₹3,727.32 crore · notice value

HAM

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · Authority named in project record

Package II runs from Pragnapur at kilometre 82 to Tangad Palle at kilometre 160 under the Hybrid Annuity Model. NHAI records a tender value of ₹3,727.32 crore.

Recorded works-bid window elapsed · project tracking continues

NHAI

Project & commercial implications →
MaharashtraCapital project

₹3,653.09crore

Pagote–Chowk: ₹3,653.09 crore BOT (Toll) notice

₹3,653.09 crore · notice value

BOT (Toll)

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityBOT–TollNHAI · Authority named in project record

The successor NHAI tender 2025_NHAI_244402_1 concerns a 29.219 kilometre six-lane Pagote–Chowk highway in Maharashtra under BOT (Toll), with a recorded value of ₹3,653.09 crore.

Recorded works-bid window elapsed · project tracking continues

NHAI

Project & commercial implications →
Varanasi, Uttar PradeshCapital project

₹10,998.32crore

Varanasi Varuna corridor: ₹10,998.32 crore HAM project watch

₹10,998.32 crore · announced project

HAM · as described in government announcement

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityGovernment of India / Road infrastructure authorities · Authority named in project record

The government’s New India Samachar issue for 1–15 August 2026 describes a six/four-lane elevated Varuna corridor with ramps and loops, connecting the NH-31 side to Kashi railway station.

Project development / announced programme

Government of India / Road infrastructure authorities

Project & commercial implications →
Arunachal PradeshCapital project

₹2,248.94crore

Frontier Highway: the ₹2,248.94-crore Lada–Sarli approval within a wider implementation pipeline

₹2,248.94 crore · Lada–Sarli packages 1, 2, 3 and 6 approved in February 2024; not the whole corridor

105.59 km sanctioned Lada–Sarli subset · wider NH-913 section tracking

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Institution named in source recordRegional Office Itanagar · Institution named in source record

2026_MoRTH_905015_1 · Engineering services: Recorded Deadline Passed · recorded closing 30/9/2026, 11:00:00 am IST · checked 30 September 2026

2026_MoRTH_905009_1 · Engineering services: Recorded Deadline Passed · recorded closing 30/9/2026, 11:00:00 am IST · checked 30 September 2026

2026_MoRTH_904999_1 · Engineering services: Recorded Deadline Passed · recorded closing 30/9/2026, 11:00:00 am IST · checked 30 September 2026

2026_MoRTH_904991_1 · Engineering services: Recorded Deadline Passed · recorded closing 30/9/2026, 11:00:00 am IST · checked 30 September 2026

The NH-913 implementation map spans Huri–Taliha, Bile–Migging, Lada–Sarli and Bomdila–Nafra–Lada sections. A historical ₹2,248.94-crore approval identifies a defined Lada–Sarli subset; current engineering appointments provide a separate view of implementation responsibilities.

Implementation-support records · dated capital approval for specified Lada–Sarli works

MoRTH · Regional Office Itanagar and the respective implementing entities

Project & commercial implications →
Tamil NaduCapital project

₹1,423.5crore

Chennai’s ₹1,423.50-crore logistics park: rail connectivity is the commercial multiplier

₹1,423.50 crore · whole-park project value disclosed in March 2023

184.27 acres · park linked to Kadambattur Railway Station

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityManufacturing, MSME & Industrial PolicyTrade, Customs & Strategic Supply ChainsNHLML · Institution named in source recordNHAI · Institution named in source recordChennai MMLP · Institution named in source record

The Kadambattur connection belongs within the wider Chennai multimodal logistics park investment. The opportunity extends beyond track works to terminals, warehousing, equipment, cargo services and the commercial use of a connected logistics asset.

Awarded park development · rail-connectivity implementation support

NHLML and the Chennai MMLP implementing entities

Project & commercial implications →
GujaratCapital project

₹873.62crore

Vadodara–Mumbai Package IX: ₹873.62-crore Karvad–Jujuwa balance works

₹873.62 crore · balance-works estimate, not an awarded amount

26.6 km · km 128.0–154.6 · eight-lane EPC balance works

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · PIU Surat · Authority named in project record

A 26.6-km, eight-lane EPC balance-works package. Assess remaining civil and systems scope, existing-asset interfaces and the actual purchasing route; this estimate is not the entire expressway investment.

Recorded balance-works estimate · implementation and contractor tracking

NHAI · PIU Surat

Project & commercial implications →
MaharashtraCapital project

₹821.05crore

Solapur elevated corridor: ₹821.05-crore recorded works estimate

₹821.05 crore · historical notice estimate for the identified works scope

9.66 km · km 0.050–9.710 · HAM elevated corridor

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityHAMNHAI · Authority named in project record

Four-lane elevated infrastructure and approaches on the Old Pune Naka–Boramani Naka section. Assess HAM and construction interfaces, urban delivery conditions and package-specific purchasing; the estimate is separate from a final award.

Recorded works estimate · independent implementation milestones

NHAI

Project & commercial implications →

Project estimates are identified by scope and source. Consultancy fees, programme funding and a company’s wider investment commitment are not ranked as individual project capex. Project visibility continues beyond preparation-procurement deadlines.