JharkhandDevelopment pipeline
NH-133 · Mirza Chauki–Mahagama corridor
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentNHAI’s new preparation record concerns the NH-133 section between Mirza Chauki, identified in the notice as earlier Ekchari, and Mahagama. The commercial pipeline begins with defining the corridor and preconstruction requirements; the design appointment is not a main-works award.
MaharashtraDevelopment pipeline
96.5-km stated span · existing four-lane corridor
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityDBFOTO&M/ServicesNHAI · Authority for the identified preparation or engineering recordTwo operating four-lane highway assets have fresh engineering-support records. Their commercial relevance lies in maintenance, safety, rehabilitation and concession performance, with each corridor’s model and buyer kept separate.
KarnatakaDevelopment pipeline
189.6-km stated span · existing four-lane corridor
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityBOT–TollO&M/ServicesNHAI · Authority for the identified preparation or engineering recordTwo operating four-lane highway assets have fresh engineering-support records. Their commercial relevance lies in maintenance, safety, rehabilitation and concession performance, with each corridor’s model and buyer kept separate.
MaharashtraDevelopment pipeline
Approximately 140 km · Dighi–Poladpur–Surur
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentNHAI · Tendering authority for corridor feasibility and DPR2026_NHAI_284464_1 · Corridor feasibility and DPR services: Recorded Deadline Passed · recorded closing 15/10/2026, 11:00:00 am IST · checked 11 October 2026
The proposed Maharashtra corridor links Dighi Port with NH-48; its current engineering-services window runs to 15 October 2026.
RajasthanDevelopment pipeline
Proposed expressway corridor
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentO&M/ServicesNational Highways Authority of India · Implementing authority2026_NHAI_292987_1 · Engineering services: Recorded Deadline Passed · recorded closing 29/10/2026, 11:00:00 am IST · checked 26 October 2026
The asset remains the focus; the engineering invitation is a separately identified participation window.
What changed? Recorded the 21 October Corrigendum II extending the supporting DPR submission to 29 October and opening to 30 October. The underlying project scope, original event and publication dates, capital basis and material-update date are unchanged.
West BengalDevelopment pipeline
Six-lane alignment · 7.5 km connection and 18.5 km corridor
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentO&M/ServicesNational Highways Authority of India · Implementing authority2026_NHAI_286566_1 · Engineering services: Recorded Deadline Passed · recorded closing 12/10/2026, 11:00:00 am IST · checked 4 October 2026
The asset remains the focus; the engineering invitation is a separately identified participation window.
KarnatakaDevelopment pipeline
Six-lane NH48 corridors
Industry, model and participation details
Transport, Logistics & MobilityInfrastructure & Urban DevelopmentO&M/ServicesNational Highways Authority of India · Implementing authority2026_NHAI_289532_1 · Engineering services: Recorded Deadline Passed · recorded closing 16/10/2026, 3:00:00 pm IST · checked 4 October 2026
The asset remains the focus; the engineering invitation is a separately identified participation window.
JharkhandDevelopment pipeline
128.098 km combined · two four-laning sections
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · Institution named in source recordPIU Daltonganj · Institution named in source recordThe Shildag–Parwa More and Jharkhand–Bihar border–Chandwa sections establish a highway-development pipeline of approximately 128.098 km. Industry positioning should focus on the future road assets, construction interfaces and delivery model as project preparation advances.
AssamDevelopment pipeline
Second parallel tube · CH 138 · Assam
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · Authority named in project recordThe Assam project develops a second tube beside the existing tunnel. Candidate work follows the approved civil, approach, system and operating interfaces, not the value of its preparation consultancy.
MaharashtraDevelopment pipeline
Final concession documents to verify
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · Authority named in project recordNHAI tender 2026_NHAI_277028_1 describes a six-lane access-controlled greenfield highway from Adgaon at kilometre 138 to Ahilyanagar at kilometre 290.
MaharashtraCapital project
₹9,030.38crore
₹9,030.38 crore · notice value
Concession / highway development; final RFP governs
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · Authority named in project recordNHAI notice 2026_NHAI_277031_1 covers a six-lane access-controlled greenfield highway from Ahilyanagar to Hasapur, kilometre 290 to 512, in Maharashtra. The published tender value is ₹9,030.38 crore.
TelanganaDevelopment pipeline
HAM
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · Authority named in project recordNHAI’s organisation list includes tender 2026_NHAI_278192_1 for the northern expressway’s Girmapur–Pragnapur Package I.
TelanganaCapital project
₹3,727.32crore
₹3,727.32 crore · notice value
HAM
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityNHAI · Authority named in project recordPackage II runs from Pragnapur at kilometre 82 to Tangad Palle at kilometre 160 under the Hybrid Annuity Model. NHAI records a tender value of ₹3,727.32 crore.
MaharashtraCapital project
₹3,653.09crore
₹3,653.09 crore · notice value
BOT (Toll)
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityBOT–TollNHAI · Authority named in project recordThe successor NHAI tender 2025_NHAI_244402_1 concerns a 29.219 kilometre six-lane Pagote–Chowk highway in Maharashtra under BOT (Toll), with a recorded value of ₹3,653.09 crore.
Tamil NaduCapital project
₹1,423.5crore
₹1,423.50 crore · whole-park project value disclosed in March 2023
184.27 acres · park linked to Kadambattur Railway Station
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityManufacturing, MSME & Industrial PolicyTrade, Customs & Strategic Supply ChainsNHLML · Institution named in source recordNHAI · Institution named in source recordChennai MMLP · Institution named in source recordThe Kadambattur connection belongs within the wider Chennai multimodal logistics park investment. The opportunity extends beyond track works to terminals, warehousing, equipment, cargo services and the commercial use of a connected logistics asset.
MaharashtraCapital project
₹821.05crore
₹821.05 crore · historical notice estimate for the identified works scope
9.66 km · km 0.050–9.710 · HAM elevated corridor
Industry, model and participation details
Infrastructure & Urban DevelopmentTransport, Logistics & MobilityHAMNHAI · Authority named in project recordFour-lane elevated infrastructure and approaches on the Old Pune Naka–Boramani Naka section. Assess HAM and construction interfaces, urban delivery conditions and package-specific purchasing; the estimate is separate from a final award.
Project estimates are identified by scope and source. Consultancy fees, programme funding and a company’s wider investment commitment are not ranked as individual project capex. Project visibility continues beyond preparation-procurement deadlines.