Explore the underlying assets, their investment scale and the route to participation. Project preparation, implementation and supplier opportunities sit within one connected view.

41 projects · Latest & Updated firstReset filters
KarnatakaDevelopment pipeline

Approximately 8 km · four-lane bypass

Athani town bypass on NH-548B

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentMoRTH Regional Office Bangalore · Issuing authority for the preparation notice

Three preparation notices identify separate four-laning and bypass assets. Their engineering studies are milestones within the underlying road-development pipeline; each corridor needs its own investment, approvals and implementation assessment.

Project preparation · separately scoped road asset

MoRTH Regional Office Bangalore

Project & commercial implications →
Tamil NaduDevelopment pipeline

Ennore–Mahabalipuram · canal rejuvenation and possible water-metro transport

Buckingham Canal: Chennai examines water-metro transport alongside rejuvenation

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentEnvironment & Climate

2026_CMRL_924016_1 · Supporting professional services: Submission not started · recorded closing 30/11/2026, 3:00:00 pm IST · checked 4 November 2026

The Ennore–Mahabalipuram study combines canal rejuvenation with assessment of a possible water-metro mode. Its business relevance lies in integrated waterway, transport and environmental project development, rather than a sanctioned ferry-construction programme.

Feasibility and project preparation · supporting submissions start 24 November

Chennai Metro Rail Limited

Project & commercial implications →
KarnatakaDevelopment pipeline

41.43 km · four-lane bypass development

Kalaburagi bypass chain: NH-150E to NH-50 via NH-150

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentMoRTH Regional Office Bangalore · Issuing authority for the preparation notice

Three preparation notices identify separate four-laning and bypass assets. Their engineering studies are milestones within the underlying road-development pipeline; each corridor needs its own investment, approvals and implementation assessment.

Project preparation · separately scoped road asset

MoRTH Regional Office Bangalore

Project & commercial implications →
KarnatakaDevelopment pipeline

Approximately 64 km · km 9.00–72.92 · four-laning

NH-150E: Kalaburagi–Chowdapur–Afzalpur–Ballurgi development

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentMoRTH Regional Office Bangalore · Issuing authority for the preparation notice

Three preparation notices identify separate four-laning and bypass assets. Their engineering studies are milestones within the underlying road-development pipeline; each corridor needs its own investment, approvals and implementation assessment.

Project preparation · separately scoped road asset

MoRTH Regional Office Bangalore

Project & commercial implications →
BiharDevelopment pipeline

Mobile Quality Control Van · supply, operation and maintenance

Bihar: mobile quality-control and highway testing service

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentDigital, Telecom & Electronics

MoRTH’s separate second-call procurements cover supply, operation and maintenance of Mobile Quality Control Vans for non-destructive testing of National Highway works. The opportunities concern a defined testing service and equipment lifecycle, not the construction value of every road tested.

Two technical-services procurements · separate state scopes

MoRTH / MoRTH Special Project Zone Delhi

Project & commercial implications →
AssamDevelopment pipeline

Kamakhya Railway Station–Kamakhya Temple connection · DBFOT

Kamakhya station–temple ropeway: a concession linking construction with long-term passenger operations

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentDBFOT

The proposed connection between Kamakhya Railway Station and Kamakhya Temple is being procured on DBFOT terms. Investor assessment should connect the transport function, land and access interfaces, technology partnership and lifecycle obligations rather than treat the notice as a stand-alone engineering appointment.

DBFOT concession procurement recorded

National Highways Logistics Management Limited / NHAI

Project & commercial implications →
JharkhandDevelopment pipeline

NH-133 · Mirza Chauki–Mahagama corridor

NH-133 Mirza Chauki–Mahagama: the development corridor behind the feasibility and design milestone

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban Development

NHAI’s new preparation record concerns the NH-133 section between Mirza Chauki, identified in the notice as earlier Ekchari, and Mahagama. The commercial pipeline begins with defining the corridor and preconstruction requirements; the design appointment is not a main-works award.

Feasibility and detailed-project preparation

National Highways Authority of India

Project & commercial implications →
RajasthanDevelopment pipeline

NH-921 km 0.850–50.246 · 49.396 km four-laning; NH-21 km 0.000–1.700 flyover

NH-921 Mahwa–Mandawar–Rajgarh: four-laning paired with the NH-21 junction flyover

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentEPC

The procurement combines 49.396 km of four-laning with paved shoulders on NH-921 and a separate 1.700-km flyover scope on NH-21. Contractors and finance partners should evaluate the combined package’s road, structural and junction interfaces rather than a professional-services opportunity.

Main-works procurement recorded · EPC delivery

MoRTH · Bharatmala and Special Projects Cell

Project & commercial implications →
Uttar PradeshDevelopment pipeline

Mobile Quality Control Van · supply, operation and maintenance

Uttar Pradesh: mobile quality-control and highway testing service

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentDigital, Telecom & Electronics

MoRTH’s separate second-call procurements cover supply, operation and maintenance of Mobile Quality Control Vans for non-destructive testing of National Highway works. The opportunities concern a defined testing service and equipment lifecycle, not the construction value of every road tested.

Two technical-services procurements · separate state scopes

MoRTH / MoRTH Special Project Zone Delhi

Project & commercial implications →
GujaratDevelopment pipeline

Integrated Financial Management System · G-ACRP

Ahmedabad IFMS: municipal financial transformation reaches a revised selection milestone

Industry, model and participation detailsInfrastructure & Urban DevelopmentFinancial Services, Capital Markets & InsuranceDigital, Telecom & ElectronicsGovernance & Admin

2026_WBAMC_924353_1 · Supporting professional services: Recorded Deadline Passed · recorded closing 23/10/2026, 3:00:00 pm IST · checked 20 October 2026

Ahmedabad’s World Bank-financed city-resilience programme includes an Integrated Financial Management System. The consultant-selection extension creates a defined delivery and public-finance opportunity, separate from the wider city’s capital programme.

Consultant-selection extension · submission on 23 October

Ahmedabad Municipal Corporation

Project & commercial implications →
India · DelhiDevelopment pipeline

Digital transformation · patents, designs and trademarks administration

CGPDTM digital transformation: the integrator role connects technology and public-service delivery

Industry, model and participation detailsDigital, Telecom & ElectronicsAI, Cybersecurity & Data GovernanceGovernance & AdminTelecommunications Consultants India Limited · System-integrator selection authorityOffice of the Controller General of Patents, Designs and Trade Marks · Named institution for the digital-transformation requirement

2026_TCIL_295134_1 · TCIL system-integrator selection EOI: Recorded Deadline Passed · recorded closing 2/11/2026, 3:00:00 pm IST · checked 20 October 2026

TCIL's system-integrator selection concerns the digital transformation of India's patents, designs and trademarks administration. The opportunity calls for an executable technology and service-delivery proposition, supported by clear implementation, data and contractual responsibilities.

TCIL system-integrator EOI · submission recorded for 2 November

TCIL as system-integrator selection authority; CGPDTM as named client institution

Project & commercial implications →
KeralaDevelopment pipeline

Deep-sea fishery training fleet · modernisation preparation

CIFNET fleet modernisation: preparation scope and the single-tender route

Industry, model and participation detailsTransport, Logistics & MobilityEducation & SkillsAgriculture, Food Processing & Rural Economy

2026_DAHDF_854330_2 · Single-tender consultancy · participation restricted to the actual invitation: Recorded Deadline Passed · recorded closing 29/10/2026, 4:00:00 pm IST · checked 20 October 2026

Modernisation of the deep-sea fishery training fleet requires a defined operating and investment case before implementation. The current DPR notice is officially classified as a single tender; public visibility is not an unrestricted invitation to consulting firms.

Single tender · participation under the invitation; submission recorded for 29 October

Director, CIFNET, Kochi

Project & commercial implications →
UttarakhandDevelopment pipeline

86 km · two lanes with paved shoulders · Gangotri–Heena

Gangotri–Heena: an 86-km hill-road upgrade reaches a revised preparation milestone

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityEnvironment & Climate

2026_MoRTH_922363_1 · Supporting professional services · qualification under the actual RFP: Recorded Deadline Passed · recorded closing 2/11/2026, 5:00:00 pm IST · checked 20 October 2026

Rehabilitation and widening of the NH-34 corridor from Gangotri to Heena remain the underlying project. A fresh DPR submission extension advances the preparation record without establishing a construction award, approved capital budget or completed design.

DPR Corrigendum II · submission extended to 2 November

MoRTH Regional Office Dehradun / NH Uttarakhand PWD

Project & commercial implications →
West BengalDevelopment pipeline

150-capacity women’s hostel · main gate · assembly-hall improvements

IMU Kolkata: student accommodation and campus improvements enter design preparation

Industry, model and participation detailsInfrastructure & Urban DevelopmentEducation & SkillsTransport, Logistics & Mobility

2026_BandR_930155_1 · Supporting professional services: Recorded Deadline Passed · recorded closing 4/11/2026, 5:30:00 pm IST · checked 20 October 2026

A 150-capacity women’s hostel, a new main gate and assembly-hall improvements form a defined maritime-education campus programme. Architecture and design procurement is the preparation milestone, with execution-stage support included.

Design preparation · supporting consultancy submission on 4 November

Indian Maritime University; Bridge & Roof as tendering organisation

Project & commercial implications →
RajasthanDevelopment pipeline

Hardware, networking, audiovisual equipment and software · listed location Rajasthan

India AI Labs: infrastructure supply requires an integrated acceptance and support plan

Industry, model and participation detailsDigital, Telecom & ElectronicsAI, Cybersecurity & Data GovernanceEducation & SkillsEquipment Supply

2026_TCIL_294962_1 · IT-infrastructure goods procurement: Recorded Deadline Passed · recorded closing 22/10/2026, 5:00:00 pm IST · checked 20 October 2026

TCIL's procurement combines hardware, networking, audiovisual equipment and software for establishing India AI Labs. The opportunity is on the technology-supply and integration side, with specification compliance and lifecycle support central to the commercial offer.

IT-infrastructure goods EOI · submission recorded for 22 October

TCIL, through its IT Division

Project & commercial implications →
RajasthanDevelopment pipeline

Proposed Kota–Rawatbhata spur · Rajasthan

Kota–Rawatbhata spur: building the evidence for a highway-development decision

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & Mobility

2026_MoRTH_930727_1 · Supporting professional services · qualification under the actual RFP: Dated participation record · recorded closing 30/11/2026, 11:00:00 am IST · checked 20 October 2026

MoRTH's preparation programme for the proposed Rajasthan spur creates a road-planning and engineering opportunity. The commercial task is to connect the commissioned studies to route, demand, approvals and delivery decisions before assuming a construction package or capital value.

DPR selection · submission recorded for 30 November

MoRTH Regional Office Jaipur

Project & commercial implications →
India · DelhiDevelopment pipeline

AI services for claims and disbursement analytics · limited RFQ

Government claims analytics: NeGD defines a limited AI-services procurement

Industry, model and participation detailsAI, Cybersecurity & Data GovernanceDigital, Telecom & ElectronicsFinancial Services, Capital Markets & InsuranceGovernance & Admin

2026_DIT_930015_1 · Limited NeGD AI-services invitation; eligibility governed by RFQ3: Recorded Deadline Passed · recorded closing 5/11/2026, 3:00:00 pm IST · checked 20 October 2026

Fraud analysis and anomaly detection in government claims and disbursements require a governed implementation proposition. The NeGD invitation is limited, and participation must follow its RFQ rather than a general open-market assumption.

Limited invitation · submission begins 21 October and closes 5 November

National e-Governance Division

Project & commercial implications →
KarnatakaDevelopment pipeline

136.7 km · km 264.00–400.70 · proposed four lanes with paved shoulders

NH-52 Anchatageri–Baleguli Cross: 136.7 km moves into four-laning preparation

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & Mobility

2026_MoRTH_930446_1 · Supporting professional services · qualification under the actual RFP: Dated participation record · recorded closing 27/11/2026, 3:00:00 pm IST · checked 20 October 2026

The proposed upgrade from two to four lanes with paved shoulders creates a substantial highway-preparation assignment. Its consultancy estimate and submission calendar are distinct from the road's eventual investment approval and construction procurement.

DPR selection · submissions begin 6 November and close 27 November

MoRTH Regional Office Bengaluru

Project & commercial implications →
Uttar PradeshDevelopment pipeline

Sector 164, Noida · design, build, finance, operate and transfer

Noida Sector 164 data centre: underwrite the complete DBFOT lifecycle

Industry, model and participation detailsDigital, Telecom & ElectronicsAI, Cybersecurity & Data GovernanceInfrastructure & Urban DevelopmentPower, Energy & RenewablesFinancial Services, Capital Markets & InsuranceDBFOTPPPInvestment/JVO&M/ServicesEPC/Construction

2026_TCIL_290900_1 · PPP-DBFOT developer and operator selection: Recorded Deadline Passed · recorded closing 29/10/2026, 3:00:00 pm IST · checked 20 October 2026

TCIL's data-centre procurement combines construction, financing, operations and eventual transfer under a PPP-DBFOT model. The investment case depends on project rights, enabling infrastructure, demand and lifecycle obligations rather than the bid-security amount or the approach of a submission date.

PPP-DBFOT procurement · submission recorded for 29 October

TCIL; General Manager (SCM) as tender-inviting authority

Project & commercial implications →
Assam · IndiaDevelopment pipeline

Proposed geological and geophysical analytics solution · GenAI

OIL geoscience analytics: define the GenAI delivery role before a pre-tender tie-up

Industry, model and participation detailsPower, Energy & RenewablesAI, Cybersecurity & Data GovernanceDigital, Telecom & ElectronicsTelecommunications Consultants India Limited · Pre-tender consortium-partner selection authorityOil India Limited · Named prospective client for the analytics solution

2026_TCIL_294384_1 · Pre-tender consortium-partner EOI, not OIL award: Recorded Deadline Passed · recorded closing 20/10/2026, 6:00:00 pm IST · checked 20 October 2026

TCIL's consortium-partner EOI concerns a proposed generative-AI solution for geological and geophysical analytics for Oil India. The immediate commercial issue is a qualified teaming arrangement, not an awarded upstream contract or an established implementation budget.

Pre-tender consortium EOI · recorded closing 20 October, 18:00 IST

TCIL for pre-tender consortium selection; Oil India as named prospective client

Project & commercial implications →
OdishaDevelopment pipeline

Concrete road overlay and side drains · defined internal-port stretch

Paradip Port: internal-road strengthening and drainage enter a supervision milestone

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban Development

2026_MoS_930027_1 · Supporting professional services: Recorded Deadline Passed · recorded closing 2/11/2026, 5:30:00 pm IST · checked 20 October 2026

Concrete overlay and side-drain improvements on a defined internal port-road stretch form the underlying infrastructure programme. The current notice concerns supporting project-management consultancy, not a newly established main-works capital value.

Supporting PMC selection · pre-bid 22 October; submission 2 November

Paradip Port Authority

Project & commercial implications →
IndiaCapital project

₹454crore

Pench hydel modernisation: a ₹454-crore turnkey works estimate for the 2×80-MW station

₹454 crore · published turnkey works tender estimate

Existing 2×80 MW · Pench HPS, Totladoh · renovation and uprating

Industry, model and participation detailsPower, Energy & RenewablesInfrastructure & Urban DevelopmentManufacturing, MSME & Industrial PolicyEPC/ConstructionEquipment Supply

2026_MPPGC_542788_1 · Turnkey works · qualification under the actual tender: Dated participation record · recorded closing 24/12/2026, 5:00:00 pm IST · checked 20 October 2026

MPPGCL’s renovation, modernisation and uprating procurement concerns an existing hydropower asset at Totladoh. The defined works estimate and delivery scope create an EPC/OEM screening opportunity, while the existing capacity must remain distinct from any eventual uprated output.

Modernisation works procurement · submission recorded for 24 December

MPPGCL; Chief Engineer (O&M Hydel), Jabalpur

Project & commercial implications →
UttarakhandDevelopment pipeline

358.50 m · km 97.327 · NH-34 rehabilitation

Tambakhani Tunnel: rehabilitation preparation advances under a revised selection timetable

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & Mobility

2026_MoRTH_922259_1 · Supporting professional services · qualification under the actual RFP: Recorded Deadline Passed · recorded closing 3/11/2026, 5:00:00 pm IST · checked 20 October 2026

The 358.50-m tunnel on NH-34 is the underlying rehabilitation asset. MoRTH's latest extension concerns its supporting DPR consultancy, creating a defined preparation-stage opportunity for qualified tunnel and structural-assessment teams.

DPR Corrigendum-4 · submission recorded for 3 November

MoRTH Regional Office Dehradun

Project & commercial implications →
Madhya PradeshDevelopment pipeline

Factory-support infrastructure · EPC Contract Mode-I

Vehicle Factory Jabalpur: an EPC route for industrial-support infrastructure

Industry, model and participation detailsDefence, Aerospace & Homeland SecurityInfrastructure & Urban DevelopmentManufacturing, MSME & Industrial PolicyEPC

2026_BandR_929982_1 · EPC/Construction · qualification under the actual notice: Recorded Deadline Passed · recorded closing 3/11/2026, 5:30:00 pm IST · checked 20 October 2026

Bridge & Roof has issued a construction invitation for infrastructure supporting the factory’s overhaul activity. The commercial opportunity concerns the defined EPC package and contractor obligations, not a direct TLGS consultancy mandate or a disclosed project-capital estimate.

EPC invitation · pre-bid 23 October; submission begins 24 October

Bridge & Roof for the Vehicle Factory Jabalpur infrastructure package

Project & commercial implications →
Jammu and KashmirDevelopment pipeline

New integrated terminal · allied works · apron extension

Srinagar Airport expansion: the terminal and apron project behind the management milestone

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentAirports Authority of India · Airport project and identified procurement authority

2026_AAI_287844_1 · Supporting project-management services: Recorded Deadline Passed · recorded closing 23/10/2026, 6:00:00 pm IST · checked 18 October 2026

AAI’s planned integrated terminal, associated infrastructure and apron extension form the underlying development opportunity. Industry positioning should follow the airport’s implementation interfaces and actual works packages, with the management-services invitation retained as supporting context.

Project preparation · management-services date revised

Airports Authority of India

Project & commercial implications →
Tamil NaduCapital project

₹1,620crore

CPCL Manali: ₹1,620-crore base-oils project links refinery investment with premium-lubricant manufacturing

Approximately ₹1,620 crore · announced whole-project cost

270,000 tonnes/year · Group II/III Lube Oil Base Stocks

Industry, model and participation detailsOil, Gas & PetrochemicalsManufacturing, MSME & Industrial PolicyInfrastructure & Urban DevelopmentTrade, Customs & Strategic Supply ChainsChennai Petroleum Corporation Limited · Project owner at Manali refinery

The 270,000-tonne-per-year Group II/III Lube Oil Base Stocks project is a defined industrial investment within the October Tamil Nadu programme. Its commercial chain runs from project execution and refinery integration to product acceptance and lubricant-market customers.

Foundation-stage project · implementation and procurement tracked separately

Chennai Petroleum Corporation Limited

Project & commercial implications →
Tamil NaduDevelopment pipeline

Capital dredging · Container Terminal Phase-I, Stage-II

Kamarajar Port: capital dredging for Container Terminal Phase-I, Stage-II

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentOil, Gas & PetrochemicalsManufacturing, MSME & Industrial PolicyKamarajar Port Limited · Port project owner

The foundation milestone identifies a marine infrastructure workstream distinct from the inaugurated Coal Berth-3. Verify the actual project and contract record before approaching implementation or supply roles.

Foundation milestone · procurement tracked separately

Kamarajar Port Limited

Project & commercial implications →
Tamil NaduDevelopment pipeline

Four-lane bypass · NH-83

NH-83 Thiruvarur: four-lane bypass foundation milestone

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentMoRTH · Sector ministry; project procurement identified separately

The bypass belongs to the Nagapattinam–Thanjavur corridor. Its individual design, value, land and purchasing record must remain separate from the wider highway programme.

Foundation milestone · project-specific implementation

MoRTH · national-highway programme

Project & commercial implications →
UttarakhandDevelopment pipeline

Two-lane bypass · earlier alignment and alternatives

Joshimath Bypass: alignment reassessment shapes the next infrastructure decision

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityEnvironment & ClimateMoRTH · Institution named in the cited developmentRegional Office Dehradun · Institution named in the cited development

2026_MoRTH_929283_1 · Supporting engineering services: Dated participation record · recorded closing 23/11/2026, 5:00:00 pm IST · checked 11 October 2026

A renewed two-lane bypass preparation exercise examines the earlier foreclosed alignment alongside alternatives. The asset opportunity depends on an adoptable route, geotechnical evidence and a deliverable construction strategy.

Project Preparation · alignment alternatives under assessment

MoRTH · Regional Office Dehradun

Project & commercial implications →
AssamDevelopment pipeline

106.78 km · proposed four-lane upgrade

NH-129 Numaligarh–Lahorijan: 106.78 km of four-laning enters project preparation

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Institution named in the cited developmentRegional Office Guwahati · Institution named in the cited development

2026_MoRTH_929297_1 · Supporting engineering services: Dated participation record · recorded closing 21/11/2026, 3:00:00 pm IST · checked 11 October 2026

The Assam corridor links Numaligarh with Lahorijan near the Nagaland border. Industry should assess the future road, structures, utilities and construction supply chain as the alignment and investment scope are developed.

Project Preparation · four-laning studies invited

MoRTH · Regional Office Guwahati

Project & commercial implications →
OdishaDevelopment pipeline

km 21–202 · specified bypass excluded

NH-26 Barpalli–Junagarh: four-laning excluding Bhawanipatna bypass

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Regional Office Bhubaneswar · Authority for the identified preparation or engineering record

NH-57 and the Barpalli–Junagarh section of NH-26 enter four-laning preparation, while NH-326/326A and separate southern NH-26 sections are being assessed for two lanes with paved shoulders.

Project preparation · future works scope

MoRTH · Regional Office Bhubaneswar

Project & commercial implications →
OdishaDevelopment pipeline

74.287 km combined · intervening 9 km excluded

Southern NH-26: two distinct paved-shoulder upgrade sections

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Regional Office Bhubaneswar · Authority for the identified preparation or engineering record

NH-57 and the Barpalli–Junagarh section of NH-26 enter four-laning preparation, while NH-326/326A and separate southern NH-26 sections are being assessed for two lanes with paved shoulders.

Project preparation · future works scope

MoRTH · Regional Office Bhubaneswar

Project & commercial implications →
OdishaDevelopment pipeline

131.500 km from stated chainages · two lanes with paved shoulders

NH-326/326A: Podamari–Mohana–Paralakhemundi upgrading

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Regional Office Bhubaneswar · Authority for the identified preparation or engineering record

NH-57 and the Barpalli–Junagarh section of NH-26 enter four-laning preparation, while NH-326/326A and separate southern NH-26 sections are being assessed for two lanes with paved shoulders.

Project preparation · future works scope

MoRTH · Regional Office Bhubaneswar

Project & commercial implications →
OdishaDevelopment pipeline

239.900 km · four-lane development

NH-57 Balangir–Nayagarh: 239.900-km four-laning preparation

Industry, model and participation detailsInfrastructure & Urban DevelopmentTransport, Logistics & MobilityMoRTH · Regional Office Bhubaneswar · Authority for the identified preparation or engineering record

NH-57 and the Barpalli–Junagarh section of NH-26 enter four-laning preparation, while NH-326/326A and separate southern NH-26 sections are being assessed for two lanes with paved shoulders.

Project preparation · future works scope

MoRTH · Regional Office Bhubaneswar

Project & commercial implications →
MaharashtraDevelopment pipeline

Approximately 140 km · Dighi–Poladpur–Surur

Dighi Port–NH-48: 140-km greenfield corridor moves through project preparation

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentNHAI · Tendering authority for corridor feasibility and DPR

2026_NHAI_284464_1 · Corridor feasibility and DPR services: Recorded Deadline Passed · recorded closing 15/10/2026, 11:00:00 am IST · checked 11 October 2026

The proposed Maharashtra corridor links Dighi Port with NH-48; its current engineering-services window runs to 15 October 2026.

Project Preparation

National Highways Authority of India

Project & commercial implications →
IndiaDevelopment pipeline

Grid-connected sodium-ion BESS pilot

NTPC sodium-ion storage: grid-connected pilot creates a technology demonstration route

Industry, model and participation detailsPower, Energy & RenewablesDigital, Telecom & ElectronicsNTPC · Pilot EOI issuer and prospective demonstration host

The EOI offers a platform to assess sodium-ion battery integration, with a recorded response date of 15 October.

Pilot-project expression of interest

NTPC Limited

Project & commercial implications →
Andaman SeaDevelopment pipeline

More than 1,632 sq km · two offshore blocks

Andaman offshore minerals: two exploration blocks enter composite-licence auction

Industry, model and participation detailsMining, Metals & Critical MineralsPower, Energy & RenewablesInvestment/JVTechnology PartnershipMinistry of Mines · Administering and auction authority

Sewell Rise-01 / West Sewell Ridge-01 · Composite-licence auction: Dated participation record · recorded closing 28/12/2026, 5:00:00 pm IST · checked 4 October 2026

Sewell Rise-01 and West Sewell Ridge-01 open a strategic exploration pathway across more than 1,632 square kilometres.

Project Preparation

Ministry of Mines

Project & commercial implications →
RajasthanDevelopment pipeline

Proposed expressway corridor

Bikaner–Kotputli Expressway: corridor preparation returns to procurement

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentO&M/ServicesNational Highways Authority of India · Implementing authority

2026_NHAI_292987_1 · Engineering services: Recorded Deadline Passed · recorded closing 29/10/2026, 11:00:00 am IST · checked 26 October 2026

The asset remains the focus; the engineering invitation is a separately identified participation window.

What changed? Recorded the 21 October Corrigendum II extending the supporting DPR submission to 29 October and opening to 30 October. The underlying project scope, original event and publication dates, capital basis and material-update date are unchanged.

Project Preparation

National Highways Authority of India

Project & commercial implications →
West BengalDevelopment pipeline

Six-lane alignment · 7.5 km connection and 18.5 km corridor

Kolkata Port–NH16: six-lane tunnel connectivity enters project preparation

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentO&M/ServicesNational Highways Authority of India · Implementing authority

2026_NHAI_286566_1 · Engineering services: Recorded Deadline Passed · recorded closing 12/10/2026, 11:00:00 am IST · checked 4 October 2026

The asset remains the focus; the engineering invitation is a separately identified participation window.

Project Preparation

National Highways Authority of India

Project & commercial implications →
Madhya PradeshDevelopment pipeline

NH752B / NH347C and NH43 / NH543 / NH45

Madhya Pradesh highway preparation: two distinct DPR packages

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentO&M/ServicesMinistry of Road Transport and Highways · Procuring authority / Regional Office

2026_MoRTH_923662_1 · Engineering services: Recorded Deadline Passed · recorded closing 7/10/2026, 5:30:00 pm IST · checked 4 October 2026

2026_MoRTH_923598_1 · Engineering services: Recorded Deadline Passed · recorded closing 7/10/2026, 5:30:00 pm IST · checked 4 October 2026

Asset-specific engineering routes support corridor development and delivery decisions.

Project Preparation

Ministry of Road Transport and Highways

Project & commercial implications →
UttarakhandDevelopment pipeline

311 km · two separate preparation packages

NH707A: Tyuni–Bataghat–Maletha corridor preparation

Industry, model and participation detailsTransport, Logistics & MobilityInfrastructure & Urban DevelopmentO&M/ServicesMinistry of Road Transport and Highways · Procuring authority / Regional Office

2026_MoRTH_914977_1 · Engineering services: Recorded Deadline Passed · recorded closing 18/11/2026, 5:00:00 pm IST · checked 4 November 2026

2026_MoRTH_914262_1 · Engineering services: Recorded Deadline Passed · recorded closing 5/10/2026, 5:00:00 pm IST · checked 4 October 2026

Asset-specific engineering routes support corridor development and delivery decisions.

What changed? Recorded the 19 October Corrigendum-7 extending only the Tyuni–Bataghat supporting consultancy to 3 November, with opening on 4 November. The separate Bataghat–Maletha notice, underlying asset, event date and publication freshness are unchanged.

Project Preparation

Ministry of Road Transport and Highways

Project & commercial implications →

Project estimates are identified by scope and source. Consultancy fees, programme funding and a company’s wider investment commitment are not ranked as individual project capex. Project visibility continues beyond preparation-procurement deadlines.